In our Belgrade to Lisbon EV duel, the smart #1 Pro beats the Renault 5 E-Tech 150 by 63 minutes, completing the 3121km route in 33h 15min. The key advantage? 1 fewer charging stop. Route calculated on July 20, 2026 using real-time charging station data.
The Renault 5 E-Tech 150's 330km range doesn't beat the smart #1 Pro's 240km here - charging speed and efficiency matter more.
The smart #1 Pro needs only 17 charging stops compared to 18 for the slowest vehicle, saving valuable time.
Winner
smart #1 Pro
- Total time: 33h 15min (63 min faster)
- Charging stops: 17
- Charging time: 3h 47min
- Energy: ~611 kWh
- Distance: 3121km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
smart #1 Pro |
| Travel time |
34h 18min |
33h 15min |
| Charging time: |
4h 52min |
3h 47min |
| Charging stops: |
18 |
17 |
| Energy used |
~562 kWh |
~562 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Belgrade (100% charge)
-
Stop 1:
Tesla Supercharger (13 min, 39% → 73%)
-
Stop 2:
Kaufland (10 min, 10% → 41%)
-
Stop 3:
Petrol (18 min, 10% → 64%)
-
Stop 4:
Fratta Nord (22 min, 10% → 73%)
-
Stop 5:
Electriease Monte Alto Nord (25 min, 10% → 78%)
-
Stop 6:
Area di Servizio Stura Ovest (13 min, 10% → 52%)
-
Stop 7:
Castellaro Nord (15 min, 10% → 57%)
-
Stop 8:
Aire de Vidauban Nord (20 min, 10% → 69%)
-
Stop 9:
Rue John Mac Adam (11 min, 10% → 47%)
-
Stop 10:
Aire De Lespignan Nord (19 min, 10% → 66%)
-
Stop 11:
IONITY Aire du Volvestre (18 min, 10% → 63%)
-
Stop 12:
Supercharger Super-U (17 min, 10% → 61%)
-
Stop 13:
Supercharger Telleria Industrialdea (14 min, 10% → 54%)
-
Stop 14:
IONITY Briviesca Norte (13 min, 10% → 52%)
-
Stop 15:
Autovía de Castilla (22 min, 10% → 73%)
-
Stop 16:
IONITY Cepsa (19 min, 10% → 66%)
-
Stop 17:
IONITY Castelo Branco Oeste (13 min, 10% → 52%)
-
Stop 18:
Área de Serviço de Santarém Oeste (10 min, 10% → 41%)
- Arrival: Lisbon
smart #1 Pro Route
- Start: Belgrade (100% charge)
-
Stop 1:
Tesla Supercharger (10 min, 40% → 71%)
-
Stop 2:
Kaufland (10 min, 10% → 49%)
-
Stop 3:
Petrol (12 min, 18% → 63%)
-
Stop 4:
Fratta Nord (18 min, 10% → 72%)
-
Stop 5:
Electriease Monte Alto Nord (20 min, 10% → 77%)
-
Stop 6:
Area di Servizio Stura Ovest (10 min, 10% → 51%)
-
Stop 7:
Castellaro Nord (10 min, 10% → 48%)
-
Stop 8:
IONITY Aire de Bréguières Nord (11 min, 20% → 62%)
-
Stop 9:
Aire de Lançon de Provence Est (10 min, 10% → 53%)
-
Stop 10:
Aire de Gigean Nord (15 min, 10% → 67%)
-
Stop 11:
IONITY Hyper U (19 min, 10% → 76%)
-
Stop 12:
Supercharger Super-U (12 min, 10% → 60%)
-
Stop 13:
Supercharger Telleria Industrialdea (10 min, 10% → 53%)
-
Stop 14:
IONITY Briviesca Norte (13 min, 10% → 62%)
-
Stop 15:
Parking Calle Miravete (12 min, 10% → 60%)
-
Stop 16:
IONITY Cepsa (14 min, 10% → 64%)
-
Stop 17:
IONITY Castelo Branco Oeste (21 min, 10% → 79%)
- Arrival: Lisbon
Why the smart #1 Pro Won
The smart #1 Pro achieved a 63-minute advantage over Renault 5 E-Tech 150 on this 3121km route. Key factors:
- Fewer charging stops: 17 stops vs 18 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 47min vs 4h 52min thanks to higher peak charging speeds or better charging curve.
Related Comparisons