In our Berlin to Brussels EV duel, the Aiways U5 beats the Jeep Avenger by 10 minutes, completing the 760km route in 8h 4min. The key advantage? 2 fewer charging stops. Route calculated on September 2, 2026 using real-time charging station data.
Despite costing 3,907 less, the Aiways U5 beats the Jeep Avenger by 10 minutes on this route.
The Aiways U5 needs only 4 charging stops compared to 6 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 8h 4min (10 min faster)
- Charging stops: 4
- Charging time: 55min
- Energy: ~143 kWh
- Distance: 760km
Quick Comparison
| Metric |
Aiways U5 |
Jeep Avenger |
| Travel time |
8h 4min |
8h 14min |
| Charging time: |
55min |
1h 3min |
| Charging stops: |
4 |
6 |
| Energy used |
~137 kWh |
~137 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Berlin (100% charge)
-
Stop 1:
SB Tank Langer, Hannover (15 min, 11% → 51%)
-
Stop 2:
Gütersloh Nord, Gütersloh (15 min, 10% → 51%)
-
Stop 3:
Landstraße, Haan (13 min, 10% → 47%)
-
Stop 4:
Fastned Carpool Maasmechelen, Maasmechelen (12 min, 10% → 43%)
- Arrival: Brussels
Jeep Avenger Route
- Start: Berlin (100% charge)
-
Stop 1:
Shell Tankstelle Hämelerwald, Lehrte (10 min, 17% → 41%)
-
Stop 2:
Fastned Rastplatz Löwenburg, Porta Westfalica (11 min, 10% → 38%)
-
Stop 3:
Autohaus Weber, Beckum (12 min, 10% → 40%)
-
Stop 4:
Shell Tankstelle Schützenstraße, Wuppertal (10 min, 10% → 35%)
-
Stop 5:
P&R Parkplatz Alfred-Wirth-Straße, Erkelenz (10 min, 11% → 37%)
-
Stop 6:
Total Zolder Noord, Heusden-Zolder (10 min, 10% → 36%)
- Arrival: Brussels
Why the Aiways U5 Won
The Aiways U5 achieved a 10-minute advantage over Jeep Avenger on this 760km route. Key factors:
- Fewer charging stops: 4 stops vs 6 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 55min vs 1h 3min thanks to higher peak charging speeds or better charging curve.
Related Comparisons