In our Berlin to Lisbon EV duel, the Audi Q4 40 e-tron beats the smart #1 Pro+ by 27 minutes, completing the 2772km route in 29h 38min. The key advantage? 4 fewer charging stops. Route calculated on July 19, 2026 using real-time charging station data.
The Audi Q4 40 e-tron needs only 13 charging stops compared to 17 for the slowest vehicle, saving valuable time.
Winner
Audi Q4 40 e-tron
- Total time: 29h 38min (27 min faster)
- Charging stops: 13
- Charging time: 3h 38min
- Energy: ~513 kWh
- Distance: 2772km
Quick Comparison
| Metric |
Audi Q4 40 e-tron |
smart #1 Pro+ |
| Travel time |
29h 38min |
30h 5min |
| Charging time: |
3h 38min |
3h 56min |
| Charging stops: |
13 |
17 |
| Energy used |
~499 kWh |
~500 kWh |
Charging Strategy Breakdown
Audi Q4 40 e-tron Route
- Start: Berlin (100% charge)
-
Stop 1:
Fastned Rastplatz Löwenburg, Porta Westfalica (12 min, 17% → 51%)
-
Stop 2:
Ehrenberg West, Wuppertal (15 min, 10% → 51%)
-
Stop 3:
IONITY Bierset, Grâce-Hollogne (14 min, 10% → 48%)
-
Stop 4:
Aire de La Sentinelle Ouest, La Sentinelle (14 min, 10% → 50%)
-
Stop 5:
Bauer Paris Occasion, Saint-Witz (19 min, 10% → 59%)
-
Stop 6:
IONITY Aire de Blois-Villerbon, Villerbon (24 min, 10% → 66%)
-
Stop 7:
Fastned Aire des Groies, Courcôme (12 min, 10% → 45%)
-
Stop 8:
Aire Fontbelleau Paris Bayonne, Lormont (12 min, 10% → 43%)
-
Stop 9:
Supercharger McDonald's, Castets (19 min, 10% → 60%)
-
Stop 10:
Repsol Lopidana, Vitoria-Gasteiz (19 min, 10% → 59%)
-
Stop 11:
Autovía de Castilla, Dueñas (19 min, 10% → 59%)
-
Stop 12:
IONITY Cepsa, Martín de Yeltes (23 min, 10% → 65%)
-
Stop 13:
Área de serviço Vila Velha Ródão oeste, Vila Velha de Ródão (16 min, 10% → 54%)
- Arrival: Lisbon
smart #1 Pro+ Route
- Start: Berlin (100% charge)
-
Stop 1:
Magic Spielhalle, Garbsen (13 min, 12% → 53%)
-
Stop 2:
Autohaus Weber, Beckum (10 min, 10% → 43%)
-
Stop 3:
Remscheid West, Remscheid (15 min, 12% → 58%)
-
Stop 4:
IONITY Bierset, Grâce-Hollogne (15 min, 10% → 58%)
-
Stop 5:
Aire de La Sentinelle Ouest, La Sentinelle (16 min, 10% → 60%)
-
Stop 6:
IONITY Novotel Roissy Saint-Witz, Saint-Witz (13 min, 10% → 52%)
-
Stop 7:
IONITY McDonald's, Artenay (15 min, 10% → 57%)
-
Stop 8:
Aire de Ste Maure de Touraine, Saint-Épain (14 min, 10% → 54%)
-
Stop 9:
Fastned Aire des Groies, Courcôme (14 min, 10% → 54%)
-
Stop 10:
Aire Fontbelleau Paris Bayonne, Lormont (12 min, 10% → 51%)
-
Stop 11:
Supercharger McDonald's, Castets (13 min, 10% → 52%)
-
Stop 12:
Supercharger Telleria Industrialdea, Zestoa (13 min, 10% → 53%)
-
Stop 13:
IONITY Briviesca Norte, Briviesca (17 min, 10% → 62%)
-
Stop 14:
Parking Calle Miravete, Simancas (16 min, 10% → 60%)
-
Stop 15:
IONITY Cepsa, Martín de Yeltes (18 min, 10% → 64%)
-
Stop 16:
IONITY Castelo Branco Oeste, Castelo Branco (12 min, 10% → 51%)
-
Stop 17:
Área de Serviço de Santarém Oeste, Santarém (10 min, 10% → 43%)
- Arrival: Lisbon
Why the Audi Q4 40 e-tron Won
The Audi Q4 40 e-tron achieved a 27-minute advantage over smart #1 Pro+ on this 2772km route. Key factors:
- Fewer charging stops: 13 stops vs 17 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 38min vs 3h 56min thanks to higher peak charging speeds or better charging curve.
Related Comparisons