In our Berlin to Rome EV duel, the Aiways U5 beats the Citroën ë-Jumpy 50kWh by 83 minutes, completing the 1491km route in 16h 28min. The key advantage? 6 fewer charging stops. Route calculated on August 13, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 18 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 16h 28min (83 min faster)
- Charging stops: 12
- Charging time: 2h 21min
- Energy: ~280 kWh
- Distance: 1491km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 50kWh |
| Travel time |
16h 28min |
17h 51min |
| Charging time: |
2h 21min |
3h 27min |
| Charging stops: |
12 |
18 |
| Energy used |
~268 kWh |
~270 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Berlin (100% charge)
-
Stop 1:
HEM Tankstelle, Schleiz (14 min, 12% → 49%)
-
Stop 2:
TotalEnergies Tankstelle, Schnaittach (12 min, 10% → 44%)
-
Stop 3:
Aral Tankstelle Schollstraße, Ingolstadt (10 min, 10% → 37%)
-
Stop 4:
Aral Tankstelle Garmischer Straße, München (10 min, 11% → 38%)
-
Stop 5:
Shell Tankstelle, Garmisch-Partenkirchen (10 min, 11% → 38%)
-
Stop 6:
OMV Tankstelle Brennersee, Gries am Brenner (15 min, 11% → 51%)
-
Stop 7:
Eni Paganella Ovest, Stazione di Lavis (15 min, 10% → 51%)
-
Stop 8:
Electra Old Wild West, San Giorgio Bigarello (12 min, 10% → 43%)
-
Stop 9:
Cantagallo Ovest, Casalecchio di Reno (10 min, 10% → 37%)
-
Stop 10:
Ristorante Goyo, Calenzano (10 min, 12% → 39%)
-
Stop 11:
Area Servizio Badia al Pino Ovest, Badia al Pino (13 min, 12% → 48%)
-
Stop 12:
Giove Ovest, Giove (10 min, 10% → 38%)
- Arrival: Rome
Citroën ë-Jumpy 50kWh Route
- Start: Berlin (100% charge)
-
Stop 1:
IONITY Autohof Bitterfeld, Bitterfeld-Wolfen (10 min, 22% → 55%)
-
Stop 2:
Burger King Autohof Kleinhelmsdorf, Heidegrund (10 min, 15% → 50%)
-
Stop 3:
HEM Tankstelle, Schleiz (10 min, 16% → 51%)
-
Stop 4:
REWE, Himmelkron (10 min, 15% → 52%)
-
Stop 5:
AVIA Tankstelle, Lauf an der Pegnitz (14 min, 11% → 60%)
-
Stop 6:
Aral Tankstelle Schollstraße, Ingolstadt (13 min, 10% → 55%)
-
Stop 7:
Aral Tankstelle Garmischer Straße, München (13 min, 10% → 56%)
-
Stop 8:
Shell Tankstelle, Garmisch-Partenkirchen (10 min, 10% → 46%)
-
Stop 9:
Raststation Europabrücke, Schönberg im Stubaital (10 min, 13% → 48%)
-
Stop 10:
Smatrics Raststätte Kostner, Varna (15 min, 12% → 61%)
-
Stop 11:
Eni Paganella Ovest, Stazione di Lavis (12 min, 10% → 53%)
-
Stop 12:
Garda Ovest, Cavaion Veronese (10 min, 10% → 46%)
-
Stop 13:
Electra Mantova Village, Bagnolo San Vito (14 min, 14% → 61%)
-
Stop 14:
Cantagallo Ovest, Casalecchio di Reno (11 min, 10% → 52%)
-
Stop 15:
Ristorante Goyo, Calenzano (13 min, 10% → 57%)
-
Stop 16:
Area Servizio Badia al Pino Ovest, Badia al Pino (10 min, 10% → 47%)
-
Stop 17:
Supercharger La Bettola del Buttero, Fabro (10 min, 10% → 46%)
-
Stop 18:
Giove Ovest, Giove (12 min, 16% → 57%)
- Arrival: Rome
Why the Aiways U5 Won
The Aiways U5 achieved a 83-minute advantage over Citroën ë-Jumpy 50kWh on this 1491km route. Key factors:
- Fewer charging stops: 12 stops vs 18 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 21min vs 3h 27min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~280 kWh vs ~371 kWh) means less time spent charging.
Related Comparisons