In our Berlin to Rome EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 5 E-Tech 120 by 64 minutes, completing the 1492km route in 15h 41min. The key advantage? 5 fewer charging stops. Route calculated on September 4, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 8 charging stops compared to 13 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 15h 41min (64 min faster)
- Charging stops: 8
- Charging time: 1h 40min
- Energy: ~247 kWh
- Distance: 1492km
Quick Comparison
| Metric |
Renault 5 E-Tech 120 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
16h 45min |
15h 41min |
| Charging time: |
2h 37min |
1h 40min |
| Charging stops: |
13 |
8 |
| Energy used |
~269 kWh |
~268 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 120 Route
- Start: Berlin (100% charge)
-
Stop 1:
Burger King Autohof Kleinhelmsdorf, Heidegrund (12 min, 13% → 52%)
-
Stop 2:
Mercedes-Benz Charging Hub Münchberg Autohaus Hahn, Münchberg (10 min, 10% → 43%)
-
Stop 3:
TotalEnergies Tankstelle, Schnaittach (14 min, 10% → 54%)
-
Stop 4:
Aral Tankstelle Schollstraße, Ingolstadt (10 min, 10% → 43%)
-
Stop 5:
Aral Tankstelle Garmischer Straße, München (10 min, 10% → 45%)
-
Stop 6:
Shell Tankstelle, Garmisch-Partenkirchen (10 min, 10% → 44%)
-
Stop 7:
OMV Tankstelle Brennersee, Gries am Brenner (17 min, 10% → 63%)
-
Stop 8:
Eni Paganella Ovest, Stazione di Lavis (17 min, 10% → 62%)
-
Stop 9:
Electra Old Wild West, San Giorgio Bigarello (12 min, 10% → 51%)
-
Stop 10:
Cantagallo Ovest, Casalecchio di Reno (10 min, 10% → 42%)
-
Stop 11:
Ristorante Goyo, Calenzano (10 min, 11% → 45%)
-
Stop 12:
Area Servizio Badia al Pino Ovest, Badia al Pino (15 min, 10% → 58%)
-
Stop 13:
Giove Ovest, Giove (10 min, 10% → 45%)
- Arrival: Rome
Renault Megane E-TECH EV60 optimum charge Route
- Start: Berlin (100% charge)
-
Stop 1:
Frankenwald West, Berg (10 min, 16% → 49%)
-
Stop 2:
TotalEnergies Tankstelle, Schnaittach (15 min, 19% → 64%)
-
Stop 3:
Aral Tankstelle Garmischer Straße, München (12 min, 10% → 52%)
-
Stop 4:
Hofer, Schönberg im Stubaital (13 min, 10% → 54%)
-
Stop 5:
Eni Paganella Ovest, Stazione di Lavis (10 min, 10% → 47%)
-
Stop 6:
Electra Old Wild West, San Giorgio Bigarello (16 min, 10% → 61%)
-
Stop 7:
Ristorante Goyo, Calenzano (13 min, 10% → 53%)
-
Stop 8:
Area di Servizio Fabro Ovest, Fabro (11 min, 10% → 50%)
- Arrival: Rome
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 64-minute advantage over Renault 5 E-Tech 120 on this 1492km route. Key factors:
- Fewer charging stops: 8 stops vs 13 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 1h 40min vs 2h 37min thanks to higher peak charging speeds or better charging curve.
Related Comparisons