In our Bern to Budapest EV duel, the Audi Q6 e-tron performance beats the Audi Q8 Sportback e-tron 55 by 61 minutes, completing the 1076km route in 10h 53min. The key advantage? 4 fewer charging stops. Route calculated on September 7, 2026 using real-time charging station data.
The Audi Q6 e-tron performance needs only 3 charging stops compared to 7 for the slowest vehicle, saving valuable time.
Winner
Audi Q6 e-tron performance
- Total time: 10h 53min (61 min faster)
- Charging stops: 3
- Charging time: 30min
- Energy: ~198 kWh
- Distance: 1076km
Quick Comparison
| Metric |
Audi Q6 e-tron performance |
Audi Q8 Sportback e-tron 55 |
| Travel time |
10h 53min |
11h 54min |
| Charging time: |
30min |
1h 30min |
| Charging stops: |
3 |
7 |
| Energy used |
~194 kWh |
~192 kWh |
Charging Strategy Breakdown
Audi Q6 e-tron performance Route
- Start: Bern (100% charge)
-
Stop 1:
Esso Tankstelle Einsteinstraße (10 min, 10% → 55%)
-
Stop 2:
City Outlet Wels-Nord (10 min, 12% → 56%)
-
Stop 3:
HPC Fachmarktzentrum Franz-Schubert-Straße (10 min, 11% → 59%)
- Arrival: Budapest
Audi Q8 Sportback e-tron 55 Route
- Start: Bern (100% charge)
-
Stop 1:
TotalEnergies Tankstelle Autohof Holzgünz (13 min, 11% → 41%)
-
Stop 2:
Esso Tankstelle Einsteinstraße (14 min, 10% → 43%)
-
Stop 3:
JET Tankstelle (13 min, 10% → 41%)
-
Stop 4:
Ansfelden Süd (10 min, 10% → 36%)
-
Stop 5:
Supercharger Weierbachweg (10 min, 10% → 34%)
-
Stop 6:
da emobil Burger King Gaudenzdorfer Gürtel (19 min, 11% → 53%)
-
Stop 7:
IONITY Bábolna (11 min, 10% → 37%)
- Arrival: Budapest
Why the Audi Q6 e-tron performance Won
The Audi Q6 e-tron performance achieved a 61-minute advantage over Audi Q8 Sportback e-tron 55 on this 1076km route. Key factors:
- Fewer charging stops: 3 stops vs 7 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 30min vs 1h 30min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~198 kWh vs ~238 kWh) means less time spent charging.
Related Comparisons