In our Bratislava to Lisbon EV duel, the VW ID. Buzz Pro LR beats the Renault 5 E-Tech 150 by 2 minutes, completing the 2836km route in 32h 18min. The key advantage? 1 fewer charging stop. Route calculated on July 19, 2026 using real-time charging station data.
The VW ID. Buzz Pro LR needs only 18 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
VW ID. Buzz Pro LR
- Total time: 32h 18min (2 min faster)
- Charging stops: 18
- Charging time: 4h 17min
- Energy: ~627 kWh
- Distance: 2836km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
VW ID. Buzz Pro LR |
| Travel time |
32h 20min |
32h 18min |
| Charging time: |
4h 14min |
4h 17min |
| Charging stops: |
19 |
18 |
| Energy used |
~510 kWh |
~510 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Bratislava (100% charge)
-
Stop 1:
Aigner Powerful Logistics (12 min, 11% → 49%)
-
Stop 2:
Fastned Burger King (10 min, 10% → 43%)
-
Stop 3:
IONITY Lechwiesen Nord (11 min, 10% → 46%)
-
Stop 4:
Shell Tankstelle (10 min, 10% → 43%)
-
Stop 5:
Shell Tankstelle (13 min, 10% → 52%)
-
Stop 6:
IONITY Zone de trois Couronnes (17 min, 10% → 62%)
-
Stop 7:
IONITY Aire de Glanon (12 min, 10% → 50%)
-
Stop 8:
Fastned Lieu dit Le Mont (10 min, 10% → 43%)
-
Stop 9:
Aire des Volcans d'Auvergne Ouest (32 min, 10% → 89%)
-
Stop 10:
Supercharger Super U (11 min, 10% → 47%)
-
Stop 11:
Lidl Avenue Salvador Allende (12 min, 10% → 49%)
-
Stop 12:
Aire de l'Océan Ouest (14 min, 10% → 55%)
-
Stop 13:
Supercharger Telleria Industrialdea (14 min, 10% → 54%)
-
Stop 14:
IONITY Briviesca Norte (13 min, 10% → 52%)
-
Stop 15:
Autovía de Castilla (15 min, 10% → 56%)
-
Stop 16:
Avenida Juan Pablo II (11 min, 10% → 45%)
-
Stop 17:
Turismo (17 min, 10% → 62%)
-
Stop 18:
Área de serviço Vila Velha Ródão oeste (10 min, 10% → 41%)
-
Stop 19:
Área de Serviço de Santarém Oeste (10 min, 13% → 44%)
- Arrival: Lisbon
VW ID. Buzz Pro LR Route
- Start: Bratislava (100% charge)
-
Stop 1:
Aigner Powerful Logistics (10 min, 22% → 46%)
-
Stop 2:
Fastned Burger King (10 min, 12% → 40%)
-
Stop 3:
IONITY Lechwiesen Nord (10 min, 11% → 41%)
-
Stop 4:
Shell Tankstelle (10 min, 10% → 39%)
-
Stop 5:
Shell Tankstelle (13 min, 10% → 47%)
-
Stop 6:
IONITY Zone de trois Couronnes (18 min, 10% → 56%)
-
Stop 7:
IONITY Aire de Glanon (12 min, 10% → 45%)
-
Stop 8:
Fastned Lieu dit Le Mont (10 min, 10% → 39%)
-
Stop 9:
Aire des Volcans d'Auvergne Ouest (33 min, 10% → 79%)
-
Stop 10:
Supercharger Super U (11 min, 10% → 43%)
-
Stop 11:
Lidl Avenue Salvador Allende (12 min, 10% → 44%)
-
Stop 12:
Aire de l'Océan Ouest (14 min, 10% → 49%)
-
Stop 13:
Supercharger Telleria Industrialdea (14 min, 10% → 49%)
-
Stop 14:
IONITY Briviesca Norte (13 min, 10% → 46%)
-
Stop 15:
Autovía de Castilla (24 min, 10% → 65%)
-
Stop 16:
IONITY Cepsa (20 min, 10% → 59%)
-
Stop 17:
IONITY Castelo Branco Oeste (13 min, 10% → 47%)
-
Stop 18:
Área de Serviço de Santarém Oeste (10 min, 10% → 38%)
- Arrival: Lisbon
Why the VW ID. Buzz Pro LR Won
The VW ID. Buzz Pro LR achieved a 2-minute advantage over Renault 5 E-Tech 150 on this 2836km route. Key factors:
- Fewer charging stops: 18 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
Related Comparisons