In our Brussels to Rome EV duel, the Aiways U5 beats the Citroën ë-Jumpy 50kWh by 86 minutes, completing the 1462km route in 16h 36min. The key advantage? 7 fewer charging stops. Route calculated on September 14, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 16h 36min (86 min faster)
- Charging stops: 12
- Charging time: 2h 16min
- Energy: ~274 kWh
- Distance: 1462km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 50kWh |
| Travel time |
16h 36min |
18h 2min |
| Charging time: |
2h 16min |
3h 24min |
| Charging stops: |
12 |
19 |
| Energy used |
~263 kWh |
~264 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Brussels (100% charge)
-
Stop 1:
Supercharger SuperGreen, Terwen (10 min, 23% → 48%)
-
Stop 2:
Fastned Aire de Keskastel Ouest, Keskastel (13 min, 14% → 49%)
-
Stop 3:
McDonald's Rue du Rosenkranz, Houssen (10 min, 10% → 37%)
-
Stop 4:
GOFAST Basel-Ost, Basel (11 min, 14% → 44%)
-
Stop 5:
Migrol Rotzlochstrasse, Stans (10 min, 10% → 39%)
-
Stop 6:
Fastned Lavorgo Sud, Faido (11 min, 10% → 42%)
-
Stop 7:
Lario Ovest, Cadorago (11 min, 10% → 42%)
-
Stop 8:
Giornali Lotto Bar Sport, Guardamiglio (12 min, 10% → 44%)
-
Stop 9:
Secchia Ovest, Modena (14 min, 10% → 48%)
-
Stop 10:
Ristorante Goyo, Calenzano (10 min, 10% → 37%)
-
Stop 11:
Area Servizio Badia al Pino Ovest, Badia al Pino (14 min, 10% → 48%)
-
Stop 12:
Giove Ovest, Giove (10 min, 10% → 38%)
- Arrival: Rome
Citroën ë-Jumpy 50kWh Route
- Start: Brussels (100% charge)
-
Stop 1:
Wanlin West, Houyet (10 min, 44% → 63%)
-
Stop 2:
Aire de Capellen Sud, Mamer (10 min, 10% → 46%)
-
Stop 3:
Supercharger SuperGreen, Terwen (10 min, 22% → 55%)
-
Stop 4:
McDonald's, Freyming-Merlebach (11 min, 13% → 53%)
-
Stop 5:
Lidl, Marmoutier (11 min, 10% → 52%)
-
Stop 6:
McDonald's Rue du Rosenkranz, Houssen (11 min, 10% → 50%)
-
Stop 7:
GOFAST Basel-Ost, Basel (10 min, 10% → 46%)
-
Stop 8:
Coop Tankstelle, Dagmersellen (11 min, 13% → 52%)
-
Stop 9:
IONITY Gotthardraststätte A2 Süd, Schattdorf (10 min, 10% → 46%)
-
Stop 10:
Fastned Lavorgo Sud, Faido (10 min, 12% → 48%)
-
Stop 11:
GOFAST Swissminiatur, Melide (10 min, 10% → 47%)
-
Stop 12:
Muggiano Ovest, Milano (11 min, 10% → 46%)
-
Stop 13:
Giornali Lotto Bar Sport, Guardamiglio (10 min, 10% → 46%)
-
Stop 14:
San Martino Ovest, Parma (13 min, 10% → 56%)
-
Stop 15:
Cantagallo Ovest, Casalecchio di Reno (11 min, 10% → 52%)
-
Stop 16:
Ristorante Goyo, Calenzano (13 min, 10% → 57%)
-
Stop 17:
Area Servizio Badia al Pino Ovest, Badia al Pino (10 min, 10% → 47%)
-
Stop 18:
Supercharger La Bettola del Buttero, Fabro (10 min, 10% → 46%)
-
Stop 19:
Giove Ovest, Giove (12 min, 16% → 57%)
- Arrival: Rome
Why the Aiways U5 Won
The Aiways U5 achieved a 86-minute advantage over Citroën ë-Jumpy 50kWh on this 1462km route. Key factors:
- Fewer charging stops: 12 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 16min vs 3h 24min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~274 kWh vs ~364 kWh) means less time spent charging.
Related Comparisons