In our Budapest to Rome EV duel, the Tesla Model 3 SR Plus beats the smart electric drive by 3398 minutes, completing the 1201km route in 12h 12min. The key advantage? 17 fewer charging stops. Route calculated on September 7, 2026 using real-time charging station data.
The Tesla Model 3 SR Plus needs only 6 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
Tesla Model 3 SR Plus
- Total time: 12h 12min (3398 min faster)
- Charging stops: 6
- Charging time: 1h 0min
- Energy: ~224 kWh
- Distance: 1201km
Quick Comparison
| Metric |
smart electric drive |
Tesla Model 3 SR Plus |
| Travel time |
68h 50min |
12h 12min |
| Charging time: |
56h 8min |
1h 0min |
| Charging stops: |
23 |
6 |
| Energy used |
~216 kWh |
~219 kWh |
Charging Strategy Breakdown
smart electric drive Route
- Start: Budapest (100% charge)
-
Stop 1:
TEApont Fehérvár Észak (18 min, 31% → 38%)
-
Stop 2:
MOL Lepsenyi északi (163 min, 10% → 73%)
-
Stop 3:
Balatonlellei pihenő Nord (166 min, 10% → 74%)
-
Stop 4:
Zalakomári pihenőhely Nord (181 min, 10% → 80%)
-
Stop 5:
MOL Pince-Sever (199 min, 10% → 87%)
-
Stop 6:
MOL (140 min, 10% → 64%)
-
Stop 7:
Tepanje West (Maribor - Celje) (77 min, 10% → 40%)
-
Stop 8:
Lopata North (Maribor - Ljubljana) (199 min, 10% → 87%)
-
Stop 9:
Petrol Šmartinska cesta (106 min, 10% → 51%)
-
Stop 10:
Schule (166 min, 10% → 74%)
-
Stop 11:
Cimitero monumentale di Gorizia (189 min, 10% → 83%)
-
Stop 12:
Fratta Nord (173 min, 10% → 77%)
-
Stop 13:
Be Charge Bazzera Nord (93 min, 10% → 46%)
-
Stop 14:
Enel IKEA (153 min, 10% → 69%)
-
Stop 15:
Adige Ovest (160 min, 10% → 72%)
-
Stop 16:
Castel Bentivoglio Ovest (194 min, 10% → 85%)
-
Stop 17:
Badia Nuova Ovest (127 min, 10% → 59%)
-
Stop 18:
Peretola Sud (49 min, 10% → 29%)
-
Stop 19:
Ladesäule (197 min, 10% → 86%)
-
Stop 20:
Area Servizio Badia al Pino Ovest (197 min, 10% → 86%)
-
Stop 21:
Area di Servizio Fabro Ovest (160 min, 10% → 72%)
-
Stop 22:
Giove Ovest (85 min, 10% → 43%)
-
Stop 23:
Flaminia Ovest (176 min, 10% → 78%)
- Arrival: Rome
Tesla Model 3 SR Plus Route
- Start: Budapest (100% charge)
-
Stop 1:
Tepanje West (Maribor - Celje) (10 min, 12% → 53%)
-
Stop 2:
Lom west (Ljubljana - Koper) (10 min, 22% → 35%)
-
Stop 3:
IONITY Risparmio Casa (10 min, 10% → 52%)
-
Stop 4:
Adige Ovest (10 min, 10% → 52%)
-
Stop 5:
Ristorante Goyo (10 min, 14% → 54%)
-
Stop 6:
Area di Servizio Fabro Ovest (10 min, 17% → 55%)
- Arrival: Rome
Why the Tesla Model 3 SR Plus Won
The Tesla Model 3 SR Plus achieved a 3398-minute advantage over smart electric drive on this 1201km route. Key factors:
- Fewer charging stops: 6 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 1h 0min vs 56h 8min thanks to higher peak charging speeds or better charging curve.
Related Comparisons