In our Dublin to Bucharest EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 4 E-Tech 150 by 41 minutes, completing the 3104km route in 37h 48min. The key advantage? 1 fewer charging stop. Route calculated on September 1, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 20 charging stops compared to 21 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 37h 48min (41 min faster)
- Charging stops: 20
- Charging time: 4h 5min
- Energy: ~513 kWh
- Distance: 3104km
Quick Comparison
| Metric |
Renault 4 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
38h 29min |
37h 48min |
| Charging time: |
4h 44min |
4h 5min |
| Charging stops: |
21 |
20 |
| Energy used |
~559 kWh |
~557 kWh |
Charging Strategy Breakdown
Renault 4 E-Tech 150 Route
- Start: Dublin (100% charge)
-
Stop 1:
Supercharger Menai Science Park (11 min, 54% → 76%)
-
Stop 2:
Birmingham Armada (12 min, 10% → 48%)
-
Stop 3:
Supercharger Poplars Garden Centre (14 min, 10% → 53%)
-
Stop 4:
Maidstone services (11 min, 10% → 45%)
-
Stop 5:
Lidl Avenue Antoine de Saint-Exupéry (15 min, 10% → 56%)
-
Stop 6:
Fastned Gentbrugge Zuid (12 min, 10% → 49%)
-
Stop 7:
Total Zolder Zuid (15 min, 10% → 57%)
-
Stop 8:
Shell Tankstelle (13 min, 10% → 52%)
-
Stop 9:
Medenbach West (15 min, 10% → 57%)
-
Stop 10:
Aral Autohof Mainfrankenpark (11 min, 10% → 47%)
-
Stop 11:
Aral Tankstelle Nürnberger Straße 25 (12 min, 10% → 49%)
-
Stop 12:
IONITY Bayerischer Wald Süd (13 min, 10% → 51%)
-
Stop 13:
eCarUp Pendlerparkplatz (13 min, 10% → 51%)
-
Stop 14:
Supercharger Weierbachweg (12 min, 10% → 48%)
-
Stop 15:
McDonald's (10 min, 10% → 44%)
-
Stop 16:
IONITY Bábolna (12 min, 10% → 48%)
-
Stop 17:
Inárcsi pihenőhely Szeged (24 min, 10% → 74%)
-
Stop 18:
Spatiu Servicii A1 Pecica Sens Arad (13 min, 10% → 51%)
-
Stop 19:
OMV (14 min, 10% → 53%)
-
Stop 20:
OMV Miercurea Sibiului stanga (Truck) (21 min, 10% → 68%)
-
Stop 21:
Kaufland Gavana (11 min, 10% → 47%)
- Arrival: Bucharest
Renault Megane E-TECH EV60 optimum charge Route
- Start: Dublin (100% charge)
-
Stop 1:
Supercharger Menai Science Park (10 min, 58% → 74%)
-
Stop 2:
Birmingham Armada (10 min, 13% → 47%)
-
Stop 3:
Supercharger Poplars Garden Centre (11 min, 12% → 50%)
-
Stop 4:
Maidstone services (10 min, 10% → 44%)
-
Stop 5:
Lidl Avenue Antoine de Saint-Exupéry (13 min, 11% → 52%)
-
Stop 6:
Fastned Gentbrugge Zuid (17 min, 10% → 62%)
-
Stop 7:
Shell Tienbaan (11 min, 10% → 50%)
-
Stop 8:
IONITY Oberhonnefeld (11 min, 10% → 49%)
-
Stop 9:
IONITY Weiskirchen Süd (15 min, 10% → 58%)
-
Stop 10:
Aral Autohof Gremsdorf (10 min, 10% → 47%)
-
Stop 11:
AVIA Tankstelle (12 min, 10% → 51%)
-
Stop 12:
Shell Tankstelle (11 min, 10% → 48%)
-
Stop 13:
Electra Stop & Go Pendlerparkplatz Amstetten West (10 min, 10% → 45%)
-
Stop 14:
da emobil Burger King Gaudenzdorfer Gürtel (13 min, 10% → 54%)
-
Stop 15:
IONITY Bábolna (10 min, 10% → 45%)
-
Stop 16:
Inárcsi pihenőhely Szeged (21 min, 10% → 70%)
-
Stop 17:
Spatiu Servicii A1 Pecica Sens Arad (11 min, 10% → 48%)
-
Stop 18:
OMV (11 min, 10% → 50%)
-
Stop 19:
OMV Miercurea Sibiului stanga (Truck) (18 min, 10% → 64%)
-
Stop 20:
Kaufland Gavana (10 min, 10% → 45%)
- Arrival: Bucharest
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 41-minute advantage over Renault 4 E-Tech 150 on this 3104km route. Key factors:
- Fewer charging stops: 20 stops vs 21 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 5min vs 4h 44min thanks to higher peak charging speeds or better charging curve.
Related Comparisons