In our Helsinki to Dublin EV duel, the Mercedes-Benz EQA 250 beats the Renault 4 E-Tech 150 by 31 minutes, completing the 3097km route in 42h 1min. The key advantage? 10 fewer charging stops. Route calculated on September 8, 2026 using real-time charging station data.
The Mercedes-Benz EQA 250 needs only 13 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
Mercedes-Benz EQA 250
- Total time: 42h 1min (31 min faster)
- Charging stops: 13
- Charging time: 4h 54min
- Energy: ~517 kWh
- Distance: 3097km
Quick Comparison
| Metric |
Mercedes-Benz EQA 250 |
Renault 4 E-Tech 150 |
| Travel time |
42h 1min |
42h 32min |
| Charging time: |
4h 54min |
5h 10min |
| Charging stops: |
13 |
23 |
| Energy used |
~557 kWh |
~559 kWh |
Charging Strategy Breakdown
Mercedes-Benz EQA 250 Route
- Start: Helsinki (100% charge)
-
Stop 1:
Neste (23 min, 34% → 90%)
-
Stop 2:
Circle K (59 min, 10% → 85%)
-
Stop 3:
IONITY Olsze Południe (22 min, 10% → 65%)
-
Stop 4:
Orlen A2 MOP Tulce (22 min, 10% → 66%)
-
Stop 5:
Aral Autohof Niederlehme (34 min, 10% → 92%)
-
Stop 6:
Fastned Rastplatz Löwenburg (20 min, 10% → 59%)
-
Stop 7:
McDonald's (10 min, 10% → 33%)
-
Stop 8:
BP De Beerze (11 min, 10% → 37%)
-
Stop 9:
Fastned Gentbrugge Nord (14 min, 10% → 46%)
-
Stop 10:
Supercharger Eurotunnel Flexiplus Lounge (23 min, 10% → 67%)
-
Stop 11:
Supercharger Poplars Garden Centre (24 min, 10% → 71%)
-
Stop 12:
Supercharger Mountain Park Hotel (22 min, 10% → 64%)
-
Stop 13:
Sir John Rogerson's Quay (10 min, 10% → 22%)
- Arrival: Dublin
Renault 4 E-Tech 150 Route
- Start: Helsinki (100% charge)
-
Stop 1:
Neste (10 min, 13% → 47%)
-
Stop 2:
Circle K Vienības (11 min, 10% → 46%)
-
Stop 3:
Girelė (14 min, 10% → 54%)
-
Stop 4:
Vilniaus (41 min, 10% → 88%)
-
Stop 5:
Kaufland (11 min, 10% → 32%)
-
Stop 6:
MOP Gajewo Zachód (12 min, 10% → 50%)
-
Stop 7:
MOP Żnin Zachód (10 min, 10% → 42%)
-
Stop 8:
MOP Dopiewiec (15 min, 10% → 55%)
-
Stop 9:
Orlen A2 MOP Gnilec (11 min, 10% → 46%)
-
Stop 10:
Circle K Autohof Ferch (16 min, 10% → 59%)
-
Stop 11:
Fastned Rastplatz Uhry Nord (12 min, 10% → 48%)
-
Stop 12:
IONITY Auetal Nord (10 min, 10% → 43%)
-
Stop 13:
Autohaus Weber (12 min, 10% → 49%)
-
Stop 14:
McDonald's (10 min, 10% → 41%)
-
Stop 15:
BP De Beerze (12 min, 10% → 48%)
-
Stop 16:
Lukoil Kortrijksesteenweg (15 min, 10% → 55%)
-
Stop 17:
ENGIE Eurotunnel Main Terminal (11 min, 10% → 45%)
-
Stop 18:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 19:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 20:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 21:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 22:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 23:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Why the Mercedes-Benz EQA 250 Won
The Mercedes-Benz EQA 250 achieved a 31-minute advantage over Renault 4 E-Tech 150 on this 3097km route. Key factors:
- Fewer charging stops: 13 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 54min vs 5h 10min thanks to higher peak charging speeds or better charging curve.
Related Comparisons