In our Lisbon to Budapest EV duel, the CUPRA Born 77 kWh beats the Renault 4 E-Tech 150 by 47 minutes, completing the 3067km route in 32h 44min. The key advantage? 3 fewer charging stops. Route calculated on September 8, 2026 using real-time charging station data.
The CUPRA Born 77 kWh needs only 17 charging stops compared to 20 for the slowest vehicle, saving valuable time.
Winner
CUPRA Born 77 kWh
- Total time: 32h 44min (47 min faster)
- Charging stops: 17
- Charging time: 4h 9min
- Energy: ~560 kWh
- Distance: 3067km
Quick Comparison
| Metric |
CUPRA Born 77 kWh |
Renault 4 E-Tech 150 |
| Travel time |
32h 44min |
33h 31min |
| Charging time: |
4h 9min |
4h 55min |
| Charging stops: |
17 |
20 |
| Energy used |
~552 kWh |
~552 kWh |
Charging Strategy Breakdown
CUPRA Born 77 kWh Route
- Start: Lisbon (100% charge)
-
Stop 1:
Turismo (10 min, 15% → 37%)
-
Stop 2:
Avenida Juan Pablo II (10 min, 10% → 39%)
-
Stop 3:
Parking Calle Miravete (10 min, 12% → 41%)
-
Stop 4:
Supercharger Estación de servicio Villaquirán (18 min, 16% → 62%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 51%)
-
Stop 6:
Supercharger Super-U (15 min, 10% → 52%)
-
Stop 7:
IONITY Aire de Garonne (22 min, 10% → 65%)
-
Stop 8:
Aire de Loupian (17 min, 10% → 57%)
-
Stop 9:
Aire de l'Arc (21 min, 10% → 64%)
-
Stop 10:
Conioli Sud (13 min, 10% → 42%)
-
Stop 11:
Area di Servizio Stura Est (21 min, 10% → 63%)
-
Stop 12:
Monte Alto Sud (15 min, 10% → 52%)
-
Stop 13:
Supercharger Omnia Hotel (15 min, 10% → 52%)
-
Stop 14:
Lom east (Koper - Ljubljana) (12 min, 10% → 23%)
-
Stop 15:
Lukovica south (Ljubljana - Maribor) (12 min, 10% → 47%)
-
Stop 16:
Petrol Murska Sobota jug (10 min, 10% → 39%)
-
Stop 17:
IONITY Balatonkeresztúr (Richtung Budapest) (14 min, 10% → 51%)
- Arrival: Budapest
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (18 min, 10% → 62%)
-
Stop 6:
Supercharger Super-U (18 min, 10% → 63%)
-
Stop 7:
IONITY Aire de Garonne (20 min, 10% → 66%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 41%)
-
Stop 9:
Aire d'Ambrussum Sud (12 min, 11% → 49%)
-
Stop 10:
Supercharger Mercure Beaumanoir (10 min, 10% → 41%)
-
Stop 11:
IONITY Aire de Vidauban Sud (15 min, 14% → 58%)
-
Stop 12:
Conioli Sud (13 min, 10% → 51%)
-
Stop 13:
Area di Servizio Stura Est (27 min, 10% → 78%)
-
Stop 14:
Monte Alto Sud (10 min, 10% → 41%)
-
Stop 15:
Tesina Sud (14 min, 13% → 56%)
-
Stop 16:
Smatrics Risparmio Casa (10 min, 10% → 43%)
-
Stop 17:
Lom east (Koper - Ljubljana) (10 min, 10% → 27%)
-
Stop 18:
Lukovica south (Ljubljana - Maribor) (15 min, 10% → 57%)
-
Stop 19:
Petrol Murska Sobota jug (11 min, 10% → 47%)
-
Stop 20:
IONITY Balatonkeresztúr (Richtung Budapest) (18 min, 10% → 62%)
- Arrival: Budapest
Why the CUPRA Born 77 kWh Won
The CUPRA Born 77 kWh achieved a 47-minute advantage over Renault 4 E-Tech 150 on this 3067km route. Key factors:
- Fewer charging stops: 17 stops vs 20 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 9min vs 4h 55min thanks to higher peak charging speeds or better charging curve.
Related Comparisons