In our Lisbon to Budapest EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 5 E-Tech 150 by 28 minutes, completing the 3068km route in 32h 54min. The key advantage? 2 fewer charging stops. Route calculated on July 19, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 18 charging stops compared to 20 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 32h 54min (28 min faster)
- Charging stops: 18
- Charging time: 4h 16min
- Energy: ~507 kWh
- Distance: 3068km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
33h 22min |
32h 54min |
| Charging time: |
4h 46min |
4h 16min |
| Charging stops: |
20 |
18 |
| Energy used |
~552 kWh |
~553 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (13 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (18 min, 10% → 63%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (17 min, 10% → 61%)
-
Stop 6:
Supercharger Super-U (18 min, 10% → 63%)
-
Stop 7:
IONITY Aire de Garonne (19 min, 10% → 66%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 41%)
-
Stop 9:
Aire d'Ambrussum Sud (12 min, 11% → 49%)
-
Stop 10:
Supercharger Mercure Beaumanoir (10 min, 10% → 41%)
-
Stop 11:
IONITY Aire de Vidauban Sud (14 min, 14% → 58%)
-
Stop 12:
Conioli Sud (13 min, 10% → 51%)
-
Stop 13:
Area di Servizio Stura Est (24 min, 10% → 77%)
-
Stop 14:
Monte Alto Sud (10 min, 10% → 41%)
-
Stop 15:
Tesina Sud (14 min, 13% → 56%)
-
Stop 16:
Smatrics Risparmio Casa (10 min, 10% → 42%)
-
Stop 17:
Lom east (Koper - Ljubljana) (10 min, 10% → 27%)
-
Stop 18:
Lukovica south (Ljubljana - Maribor) (15 min, 10% → 57%)
-
Stop 19:
Petrol Murska Sobota jug (11 min, 10% → 47%)
-
Stop 20:
IONITY Balatonkeresztúr (Richtung Budapest) (17 min, 10% → 61%)
- Arrival: Budapest
Renault Megane E-TECH EV60 optimum charge Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (10 min, 35% → 62%)
-
Stop 2:
IONITY Cepsa (14 min, 10% → 57%)
-
Stop 3:
Parking Calle Miravete (16 min, 10% → 60%)
-
Stop 4:
IONITY Briviesca Sur (12 min, 10% → 51%)
-
Stop 5:
Supercharger Telleria Industrialdea (15 min, 10% → 58%)
-
Stop 6:
Supercharger Super-U (15 min, 10% → 59%)
-
Stop 7:
IONITY Aire de Garonne (17 min, 10% → 62%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 45%)
-
Stop 9:
Le Shanghai (18 min, 10% → 65%)
-
Stop 10:
IONITY Aire de Vidauban Sud (14 min, 10% → 55%)
-
Stop 11:
Conioli Sud (12 min, 10% → 48%)
-
Stop 12:
Area di Servizio Stura Est (23 min, 10% → 73%)
-
Stop 13:
Monte Alto Sud (16 min, 10% → 60%)
-
Stop 14:
Supercharger Omnia Hotel (15 min, 10% → 59%)
-
Stop 15:
Lom east (Koper - Ljubljana) (11 min, 10% → 26%)
-
Stop 16:
Lukovica south (Ljubljana - Maribor) (13 min, 10% → 54%)
-
Stop 17:
Petrol Murska Sobota jug (10 min, 10% → 45%)
-
Stop 18:
IONITY Balatonkeresztúr (Richtung Budapest) (15 min, 10% → 58%)
- Arrival: Budapest
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 28-minute advantage over Renault 5 E-Tech 150 on this 3068km route. Key factors:
- Fewer charging stops: 18 stops vs 20 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 16min vs 4h 46min thanks to higher peak charging speeds or better charging curve.
Related Comparisons