In our Lisbon to Dublin EV duel, the CUPRA Born 77 kWh beats the Renault 4 E-Tech 150 by 51 minutes, completing the 2733km route in 32h 37min. The key advantage? 3 fewer charging stops. Route calculated on September 7, 2026 using real-time charging station data.
The CUPRA Born 77 kWh needs only 16 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
CUPRA Born 77 kWh
- Total time: 32h 37min (51 min faster)
- Charging stops: 16
- Charging time: 3h 43min
- Energy: ~499 kWh
- Distance: 2733km
Quick Comparison
| Metric |
CUPRA Born 77 kWh |
Renault 4 E-Tech 150 |
| Travel time |
32h 37min |
33h 28min |
| Charging time: |
3h 43min |
4h 31min |
| Charging stops: |
16 |
19 |
| Energy used |
~492 kWh |
~492 kWh |
Charging Strategy Breakdown
CUPRA Born 77 kWh Route
- Start: Lisbon (100% charge)
-
Stop 1:
Turismo (10 min, 15% → 37%)
-
Stop 2:
Avenida Juan Pablo II (10 min, 10% → 39%)
-
Stop 3:
Parking Calle Miravete (14 min, 12% → 52%)
-
Stop 4:
IONITY Briviesca Sur (12 min, 10% → 45%)
-
Stop 5:
Supercharger Telleria Industrialdea (10 min, 10% → 39%)
-
Stop 6:
IONITY Aire de Labenne Est (19 min, 16% → 63%)
-
Stop 7:
Aire de Saugon Est (29 min, 10% → 74%)
-
Stop 8:
Relais de la Ronde (13 min, 10% → 49%)
-
Stop 9:
Aire de la Dentelle d'Alençon (17 min, 10% → 56%)
-
Stop 10:
Aire de Bosc-Mesnil (15 min, 10% → 52%)
-
Stop 11:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 37%)
-
Stop 12:
IONITY Village Hotel (10 min, 10% → 41%)
-
Stop 13:
Moto Toddington Northbound (11 min, 10% → 44%)
-
Stop 14:
IONITY Village Hotel (10 min, 10% → 41%)
-
Stop 15:
Supercharger Mountain Park Hotel (23 min, 10% → 66%)
-
Stop 16:
Sir John Rogerson's Quay (10 min, 10% → 20%)
- Arrival: Dublin
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Why the CUPRA Born 77 kWh Won
The CUPRA Born 77 kWh achieved a 51-minute advantage over Renault 4 E-Tech 150 on this 2733km route. Key factors:
- Fewer charging stops: 16 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 43min vs 4h 31min thanks to higher peak charging speeds or better charging curve.
Related Comparisons