In our Lisbon to Dublin EV duel, the Mercedes-Benz EQA 250 beats the Renault 4 E-Tech 150 by 54 minutes, completing the 2728km route in 32h 34min. The key advantage? 9 fewer charging stops. Route calculated on September 4, 2026 using real-time charging station data.
The Mercedes-Benz EQA 250 needs only 10 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
Mercedes-Benz EQA 250
- Total time: 32h 34min (54 min faster)
- Charging stops: 10
- Charging time: 3h 50min
- Energy: ~456 kWh
- Distance: 2728km
Quick Comparison
| Metric |
Mercedes-Benz EQA 250 |
Renault 4 E-Tech 150 |
| Travel time |
32h 34min |
33h 28min |
| Charging time: |
3h 50min |
4h 31min |
| Charging stops: |
10 |
19 |
| Energy used |
~491 kWh |
~492 kWh |
Charging Strategy Breakdown
Mercedes-Benz EQA 250 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (18 min, 47% → 90%)
-
Stop 2:
Parking Calle Miravete (30 min, 10% → 84%)
-
Stop 3:
Supercharger Telleria Industrialdea (26 min, 10% → 74%)
-
Stop 4:
Aire Fontbelleau Bayonne Paris (28 min, 10% → 80%)
-
Stop 5:
Relais de la Ronde (33 min, 10% → 91%)
-
Stop 6:
Aire de Bosc-Mesnil (16 min, 10% → 50%)
-
Stop 7:
Supercharger Eurotunnel Flexiplus Lounge (23 min, 10% → 67%)
-
Stop 8:
Supercharger Poplars Garden Centre (24 min, 10% → 71%)
-
Stop 9:
Supercharger Mountain Park Hotel (22 min, 10% → 64%)
-
Stop 10:
Sir John Rogerson's Quay (10 min, 10% → 22%)
- Arrival: Dublin
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Why the Mercedes-Benz EQA 250 Won
The Mercedes-Benz EQA 250 achieved a 54-minute advantage over Renault 4 E-Tech 150 on this 2728km route. Key factors:
- Fewer charging stops: 10 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 50min vs 4h 31min thanks to higher peak charging speeds or better charging curve.
Related Comparisons