In our Lisbon to Dublin EV duel, the Renault 4 E-Tech 150 beats the MINI Cooper SE 2024 by 62 minutes, completing the 2740km route in 33h 28min. The key advantage? 2 fewer charging stops. Route calculated on September 1, 2026 using real-time charging station data.
The Renault 4 E-Tech 150 needs only 19 charging stops compared to 21 for the slowest vehicle, saving valuable time.
Winner
Renault 4 E-Tech 150
- Total time: 33h 28min (62 min faster)
- Charging stops: 19
- Charging time: 4h 31min
- Energy: ~436 kWh
- Distance: 2740km
Quick Comparison
| Metric |
MINI Cooper SE 2024 |
Renault 4 E-Tech 150 |
| Travel time |
34h 30min |
33h 28min |
| Charging time: |
5h 24min |
4h 31min |
| Charging stops: |
21 |
19 |
| Energy used |
~493 kWh |
~492 kWh |
Charging Strategy Breakdown
MINI Cooper SE 2024 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (10 min, 22% → 52%)
-
Stop 2:
Turismo (13 min, 10% → 49%)
-
Stop 3:
Avenida Juan Pablo II (10 min, 10% → 44%)
-
Stop 4:
Supercharger Hotel Resort El Montico (10 min, 10% → 41%)
-
Stop 5:
Area El Canto (10 min, 12% → 45%)
-
Stop 6:
IONITY Briviesca Sur (18 min, 10% → 59%)
-
Stop 7:
Supercharger Telleria Industrialdea (17 min, 10% → 57%)
-
Stop 8:
Supercharger McDonald's (26 min, 10% → 70%)
-
Stop 9:
Aire de Saugon Est (18 min, 10% → 58%)
-
Stop 10:
Supercharger Aire du Poitou-Charentes Nord (16 min, 10% → 55%)
-
Stop 11:
Relais de la Ronde (13 min, 10% → 49%)
-
Stop 12:
Jardiland (27 min, 10% → 71%)
-
Stop 13:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 14:
Aire de Bosc-Mesnil (23 min, 19% → 69%)
-
Stop 15:
Supercharger Eurotunnel Flexiplus Lounge (13 min, 10% → 49%)
-
Stop 16:
IONITY Village Hotel (15 min, 10% → 54%)
-
Stop 17:
Moto Toddington Northbound (18 min, 10% → 58%)
-
Stop 18:
IONITY Village Hotel (15 min, 10% → 54%)
-
Stop 19:
Supercharger Mountain Park Hotel (13 min, 10% → 50%)
-
Stop 20:
Port of Holyhead (19 min, 10% → 50%)
-
Stop 21:
Sir John Rogerson's Quay (10 min, 10% → 27%)
- Arrival: Dublin
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Why the Renault 4 E-Tech 150 Won
The Renault 4 E-Tech 150 achieved a 62-minute advantage over MINI Cooper SE 2024 on this 2740km route. Key factors:
- Fewer charging stops: 19 stops vs 21 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 31min vs 5h 24min thanks to higher peak charging speeds or better charging curve.
Related Comparisons