In our Lisbon to Dublin EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 4 E-Tech 150 by 40 minutes, completing the 2736km route in 32h 48min. The key advantage? 2 fewer charging stops. Route calculated on July 19, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 17 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 32h 48min (40 min faster)
- Charging stops: 17
- Charging time: 3h 45min
- Energy: ~452 kWh
- Distance: 2736km
Quick Comparison
| Metric |
Renault 4 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
33h 28min |
32h 48min |
| Charging time: |
4h 31min |
3h 45min |
| Charging stops: |
19 |
17 |
| Energy used |
~492 kWh |
~493 kWh |
Charging Strategy Breakdown
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Renault Megane E-TECH EV60 optimum charge Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (10 min, 35% → 62%)
-
Stop 2:
IONITY Cepsa (14 min, 10% → 57%)
-
Stop 3:
Parking Calle Miravete (16 min, 10% → 60%)
-
Stop 4:
IONITY Briviesca Sur (12 min, 10% → 51%)
-
Stop 5:
Supercharger Telleria Industrialdea (11 min, 10% → 50%)
-
Stop 6:
Supercharger McDonald's (16 min, 10% → 60%)
-
Stop 7:
Aire de Saugon Est (11 min, 10% → 50%)
-
Stop 8:
Supercharger Aire du Poitou-Charentes Nord (10 min, 10% → 47%)
-
Stop 9:
Relais de la Ronde (14 min, 10% → 56%)
-
Stop 10:
Aire de la Dentelle d'Alençon (18 min, 10% → 65%)
-
Stop 11:
Aire de Bosc-Mesnil (15 min, 10% → 59%)
-
Stop 12:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 44%)
-
Stop 13:
IONITY Village Hotel (10 min, 12% → 47%)
-
Stop 14:
Moto Toddington Northbound (11 min, 10% → 50%)
-
Stop 15:
IONITY Village Hotel (10 min, 10% → 47%)
-
Stop 16:
Supercharger Mountain Park Hotel (27 min, 10% → 77%)
-
Stop 17:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 40-minute advantage over Renault 4 E-Tech 150 on this 2736km route. Key factors:
- Fewer charging stops: 17 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 45min vs 4h 31min thanks to higher peak charging speeds or better charging curve.
Related Comparisons