In our Lisbon to Dublin EV duel, the smart #1 Pro+ beats the Renault 4 E-Tech 150 by 15 minutes, completing the 2736km route in 33h 13min. The key advantage? 1 fewer charging stop. Route calculated on July 20, 2026 using real-time charging station data.
The smart #1 Pro+ needs only 18 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
smart #1 Pro+
- Total time: 33h 13min (15 min faster)
- Charging stops: 18
- Charging time: 4h 9min
- Energy: ~499 kWh
- Distance: 2736km
Quick Comparison
| Metric |
Renault 4 E-Tech 150 |
smart #1 Pro+ |
| Travel time |
33h 28min |
33h 13min |
| Charging time: |
4h 31min |
4h 9min |
| Charging stops: |
19 |
18 |
| Energy used |
~492 kWh |
~494 kWh |
Charging Strategy Breakdown
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
smart #1 Pro+ Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (13 min, 31% → 64%)
-
Stop 2:
IONITY Cepsa (16 min, 10% → 59%)
-
Stop 3:
Parking Calle Miravete (17 min, 10% → 62%)
-
Stop 4:
IONITY Briviesca Sur (13 min, 10% → 53%)
-
Stop 5:
Supercharger Telleria Industrialdea (18 min, 10% → 64%)
-
Stop 6:
Supercharger E.Leclerc Express (12 min, 10% → 50%)
-
Stop 7:
Aire de Saugon Est (13 min, 10% → 52%)
-
Stop 8:
Supercharger Aire du Poitou-Charentes Nord (12 min, 10% → 49%)
-
Stop 9:
Relais de la Ronde (10 min, 10% → 44%)
-
Stop 10:
Jardiland (18 min, 10% → 63%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 43%)
-
Stop 12:
Les Viviers Canger (13 min, 21% → 60%)
-
Stop 13:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 44%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 15:
Moto Toddington Northbound (13 min, 10% → 52%)
-
Stop 16:
IONITY Village Hotel (11 min, 10% → 48%)
-
Stop 17:
Supercharger Mountain Park Hotel (28 min, 10% → 80%)
-
Stop 18:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
Why the smart #1 Pro+ Won
The smart #1 Pro+ achieved a 15-minute advantage over Renault 4 E-Tech 150 on this 2736km route. Key factors:
- Fewer charging stops: 18 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 9min vs 4h 31min thanks to higher peak charging speeds or better charging curve.
Related Comparisons