In our Lisbon to Sofia EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 5 E-Tech 150 by 30 minutes, completing the 3525km route in 38h 44min. The key advantage? 1 fewer charging stop. Route calculated on July 20, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 21 charging stops compared to 22 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 38h 44min (30 min faster)
- Charging stops: 21
- Charging time: 5h 5min
- Energy: ~583 kWh
- Distance: 3525km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
39h 14min |
38h 44min |
| Charging time: |
5h 47min |
5h 5min |
| Charging stops: |
22 |
21 |
| Energy used |
~635 kWh |
~635 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (13 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (10 min, 10% → 42%)
-
Stop 4:
Supercharger Estación de servicio Villaquirán (23 min, 10% → 75%)
-
Stop 5:
Supercharger Telleria Industrialdea (17 min, 10% → 61%)
-
Stop 6:
Supercharger Super-U (18 min, 10% → 63%)
-
Stop 7:
IONITY Aire de Garonne (19 min, 10% → 66%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 41%)
-
Stop 9:
Aire d'Ambrussum Sud (12 min, 11% → 49%)
-
Stop 10:
Supercharger Mercure Beaumanoir (10 min, 10% → 41%)
-
Stop 11:
IONITY Aire de Vidauban Sud (14 min, 14% → 58%)
-
Stop 12:
Conioli Sud (13 min, 10% → 51%)
-
Stop 13:
Area di Servizio Stura Est (24 min, 10% → 77%)
-
Stop 14:
Monte Alto Sud (10 min, 10% → 41%)
-
Stop 15:
Tesina Sud (14 min, 13% → 56%)
-
Stop 16:
Smatrics Risparmio Casa (10 min, 10% → 42%)
-
Stop 17:
Lom east (Koper - Ljubljana) (11 min, 10% → 28%)
-
Stop 18:
Petrol (12 min, 10% → 48%)
-
Stop 19:
Supercharger Designer Outlet Croatia (39 min, 10% → 99%)
-
Stop 20:
OMV Martinci (10 min, 10% → 43%)
-
Stop 21:
JP Putevi Srbije (22 min, 10% → 73%)
-
Stop 22:
Naplatna rampa Nais zapadno (19 min, 10% → 61%)
- Arrival: Sofia
Renault Megane E-TECH EV60 optimum charge Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (10 min, 35% → 62%)
-
Stop 2:
IONITY Cepsa (14 min, 10% → 57%)
-
Stop 3:
Parking Calle Miravete (16 min, 10% → 60%)
-
Stop 4:
IONITY Briviesca Sur (12 min, 10% → 51%)
-
Stop 5:
Supercharger Telleria Industrialdea (15 min, 10% → 58%)
-
Stop 6:
Supercharger Super-U (15 min, 10% → 59%)
-
Stop 7:
IONITY Aire de Garonne (17 min, 10% → 62%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 45%)
-
Stop 9:
Le Shanghai (18 min, 10% → 65%)
-
Stop 10:
IONITY Aire de Vidauban Sud (14 min, 10% → 55%)
-
Stop 11:
Conioli Sud (12 min, 10% → 48%)
-
Stop 12:
Area di Servizio Stura Est (23 min, 10% → 73%)
-
Stop 13:
Monte Alto Sud (16 min, 10% → 60%)
-
Stop 14:
Supercharger Omnia Hotel (15 min, 10% → 59%)
-
Stop 15:
Lom east (Koper - Ljubljana) (11 min, 10% → 26%)
-
Stop 16:
Petrol (10 min, 10% → 46%)
-
Stop 17:
Supercharger Designer Outlet Croatia (17 min, 10% → 62%)
-
Stop 18:
Tesla Supercharger (10 min, 10% → 44%)
-
Stop 19:
OMV Martinci (10 min, 11% → 45%)
-
Stop 20:
JP Putevi Srbije (19 min, 14% → 69%)
-
Stop 21:
Naplatna rampa Nais zapadno (21 min, 10% → 58%)
- Arrival: Sofia
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 30-minute advantage over Renault 5 E-Tech 150 on this 3525km route. Key factors:
- Fewer charging stops: 21 stops vs 22 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 5h 5min vs 5h 47min thanks to higher peak charging speeds or better charging curve.
Related Comparisons