In our Lisbon to Sofia EV duel, the VW ID.3 Pro S 2023 beats the Renault 5 E-Tech 150 by 91 minutes, completing the 3525km route in 37h 43min. The key advantage? 4 fewer charging stops. Route calculated on July 20, 2026 using real-time charging station data.
The VW ID.3 Pro S 2023 needs only 18 charging stops compared to 22 for the slowest vehicle, saving valuable time.
Winner
VW ID.3 Pro S 2023
- Total time: 37h 43min (91 min faster)
- Charging stops: 18
- Charging time: 3h 57min
- Energy: ~590 kWh
- Distance: 3525km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
VW ID.3 Pro S 2023 |
| Travel time |
39h 14min |
37h 43min |
| Charging time: |
5h 47min |
3h 57min |
| Charging stops: |
22 |
18 |
| Energy used |
~635 kWh |
~631 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (13 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (10 min, 10% → 42%)
-
Stop 4:
Supercharger Estación de servicio Villaquirán (23 min, 10% → 75%)
-
Stop 5:
Supercharger Telleria Industrialdea (17 min, 10% → 61%)
-
Stop 6:
Supercharger Super-U (18 min, 10% → 63%)
-
Stop 7:
IONITY Aire de Garonne (19 min, 10% → 66%)
-
Stop 8:
Aire de Lespignan Sud (10 min, 10% → 41%)
-
Stop 9:
Aire d'Ambrussum Sud (12 min, 11% → 49%)
-
Stop 10:
Supercharger Mercure Beaumanoir (10 min, 10% → 41%)
-
Stop 11:
IONITY Aire de Vidauban Sud (14 min, 14% → 58%)
-
Stop 12:
Conioli Sud (13 min, 10% → 51%)
-
Stop 13:
Area di Servizio Stura Est (24 min, 10% → 77%)
-
Stop 14:
Monte Alto Sud (10 min, 10% → 41%)
-
Stop 15:
Tesina Sud (14 min, 13% → 56%)
-
Stop 16:
Smatrics Risparmio Casa (10 min, 10% → 42%)
-
Stop 17:
Lom east (Koper - Ljubljana) (11 min, 10% → 28%)
-
Stop 18:
Petrol (12 min, 10% → 48%)
-
Stop 19:
Supercharger Designer Outlet Croatia (39 min, 10% → 99%)
-
Stop 20:
OMV Martinci (10 min, 10% → 43%)
-
Stop 21:
JP Putevi Srbije (22 min, 10% → 73%)
-
Stop 22:
Naplatna rampa Nais zapadno (19 min, 10% → 61%)
- Arrival: Sofia
VW ID.3 Pro S 2023 Route
- Start: Lisbon (100% charge)
-
Stop 1:
Área de Serviço (10 min, 39% → 49%)
-
Stop 2:
IONITY Cepsa (10 min, 16% → 49%)
-
Stop 3:
Parking Calle Miravete (11 min, 11% → 50%)
-
Stop 4:
IONITY Briviesca Sur (10 min, 10% → 45%)
-
Stop 5:
Supercharger Telleria Industrialdea (10 min, 12% → 48%)
-
Stop 6:
Supercharger Super-U (11 min, 10% → 50%)
-
Stop 7:
IONITY Aire de Garonne (18 min, 10% → 62%)
-
Stop 8:
Aire de Loupian (14 min, 10% → 55%)
-
Stop 9:
Aire de l'Arc (17 min, 10% → 61%)
-
Stop 10:
Conioli Sud (13 min, 10% → 41%)
-
Stop 11:
Area di Servizio Stura Est (16 min, 10% → 60%)
-
Stop 12:
Monte Alto Sud (11 min, 10% → 50%)
-
Stop 13:
Supercharger Omnia Hotel (12 min, 10% → 51%)
-
Stop 14:
Barje Jug (10 min, 10% → 45%)
-
Stop 15:
Supercharger Designer Outlet Croatia (12 min, 10% → 51%)
-
Stop 16:
Tesla Supercharger (16 min, 10% → 60%)
-
Stop 17:
JP Putevi Srbije (15 min, 10% → 57%)
-
Stop 18:
Naplatna rampa Nais zapadno (21 min, 10% → 48%)
- Arrival: Sofia
Why the VW ID.3 Pro S 2023 Won
The VW ID.3 Pro S 2023 achieved a 91-minute advantage over Renault 5 E-Tech 150 on this 3525km route. Key factors:
- Fewer charging stops: 18 stops vs 22 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 57min vs 5h 47min thanks to higher peak charging speeds or better charging curve.
Related Comparisons