In our Lisbon to Vilnius EV duel, the Audi Q4 Sportback 40 e-tron beats the Renault 5 E-Tech 150 by 27 minutes, completing the 3803km route in 41h 1min. The key advantage? 1 fewer charging stop. Route calculated on July 19, 2026 using real-time charging station data.
The Audi Q4 Sportback 40 e-tron needs only 22 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
Audi Q4 Sportback 40 e-tron
- Total time: 41h 1min (27 min faster)
- Charging stops: 22
- Charging time: 5h 33min
- Energy: ~678 kWh
- Distance: 3803km
Quick Comparison
| Metric |
Audi Q4 Sportback 40 e-tron |
Renault 5 E-Tech 150 |
| Travel time |
41h 1min |
41h 28min |
| Charging time: |
5h 33min |
5h 58min |
| Charging stops: |
22 |
23 |
| Energy used |
~685 kWh |
~685 kWh |
Charging Strategy Breakdown
Audi Q4 Sportback 40 e-tron Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (10 min, 43% → 62%)
-
Stop 2:
IONITY Cepsa (13 min, 16% → 51%)
-
Stop 3:
Parking Calle Miravete (16 min, 10% → 54%)
-
Stop 4:
IONITY Briviesca Sur (13 min, 10% → 46%)
-
Stop 5:
Supercharger Telleria Industrialdea (12 min, 10% → 45%)
-
Stop 6:
Supercharger McDonald's (12 min, 10% → 45%)
-
Stop 7:
Aire Fontbelleau Bayonne Paris (14 min, 10% → 48%)
-
Stop 8:
Supercharger N10 (12 min, 10% → 45%)
-
Stop 9:
IONITY Aire de Service de Fontaine Colette (14 min, 10% → 49%)
-
Stop 10:
IONITY McDonald's (18 min, 10% → 58%)
-
Stop 11:
Aire de Ressons Est (15 min, 10% → 52%)
-
Stop 12:
IONITY Le Rœulx Sud (13 min, 10% → 47%)
-
Stop 13:
IONITY Shell Eupen (15 min, 10% → 52%)
-
Stop 14:
IONITY Lichtendorf Süd (12 min, 10% → 44%)
-
Stop 15:
Fastned Rastplatz Fuchsgrund Süd (13 min, 10% → 46%)
-
Stop 16:
Fastned Rastplatz Uhry Süd (14 min, 10% → 50%)
-
Stop 17:
Circle K Autohof Ferch (19 min, 10% → 60%)
-
Stop 18:
MOP Rogoziniec (14 min, 10% → 48%)
-
Stop 19:
MOP Lądek (12 min, 10% → 43%)
-
Stop 20:
IONITY Niesułków (10 min, 10% → 37%)
-
Stop 21:
Factory Annopol (32 min, 10% → 75%)
-
Stop 22:
MOP Rudniki Południe (30 min, 10% → 69%)
- Arrival: Vilnius
Renault 5 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (13 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (18 min, 10% → 63%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (13 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (13 min, 10% → 52%)
-
Stop 7:
Aire Fontbelleau Bayonne Paris (15 min, 10% → 57%)
-
Stop 8:
Supercharger N10 (13 min, 10% → 53%)
-
Stop 9:
IONITY Aire de Service de Fontaine Colette (15 min, 10% → 58%)
-
Stop 10:
IONITY McDonald's (20 min, 10% → 69%)
-
Stop 11:
Aire de Ressons Est (17 min, 10% → 61%)
-
Stop 12:
IONITY Le Rœulx Sud (14 min, 10% → 55%)
-
Stop 13:
IONITY Shell Eupen (17 min, 10% → 61%)
-
Stop 14:
IONITY Lichtendorf Süd (13 min, 10% → 52%)
-
Stop 15:
Fastned Rastplatz Fuchsgrund Süd (10 min, 10% → 41%)
-
Stop 16:
Shell Tankstelle Hämelerwald (10 min, 12% → 45%)
-
Stop 17:
Industrie und Gewerbepark Mittelelbe (18 min, 10% → 64%)
-
Stop 18:
Autohaus König (11 min, 10% → 47%)
-
Stop 19:
MOP Rogoziniec (17 min, 10% → 61%)
-
Stop 20:
Orlen MOP Osiecza III (11 min, 10% → 46%)
-
Stop 21:
IONITY Niesułków (10 min, 10% → 42%)
-
Stop 22:
Factory Annopol (32 min, 10% → 89%)
-
Stop 23:
MOP Rudniki Południe (27 min, 10% → 82%)
- Arrival: Vilnius
Why the Audi Q4 Sportback 40 e-tron Won
The Audi Q4 Sportback 40 e-tron achieved a 27-minute advantage over Renault 5 E-Tech 150 on this 3803km route. Key factors:
- Fewer charging stops: 22 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 5h 33min vs 5h 58min thanks to higher peak charging speeds or better charging curve.
Related Comparisons