In our Madrid to Dublin EV duel, the Audi e-tron GT beats the MINI Cooper SE 2024 by 123 minutes, completing the 2265km route in 27h 17min. The key advantage? 5 fewer charging stops. Route calculated on September 6, 2026 using real-time charging station data.
The Audi e-tron GT needs only 12 charging stops compared to 17 for the slowest vehicle, saving valuable time.
Winner
Audi e-tron GT
- Total time: 27h 17min (123 min faster)
- Charging stops: 12
- Charging time: 2h 38min
- Energy: ~507 kWh
- Distance: 2265km
Quick Comparison
| Metric |
Audi e-tron GT |
MINI Cooper SE 2024 |
| Travel time |
27h 17min |
29h 20min |
| Charging time: |
2h 38min |
4h 32min |
| Charging stops: |
12 |
17 |
| Energy used |
~408 kWh |
~409 kWh |
Charging Strategy Breakdown
Audi e-tron GT Route
- Start: Madrid (100% charge)
-
Stop 1:
Supercharger Hotelandgo Arasur (17 min, 17% → 71%)
-
Stop 2:
Supercharger McDonald's (17 min, 10% → 68%)
-
Stop 3:
IONITY Aire de Saint-Léger Est (16 min, 10% → 65%)
-
Stop 4:
Relais de la Ronde (10 min, 10% → 43%)
-
Stop 5:
Jardiland (19 min, 14% → 72%)
-
Stop 6:
Aire de Bosc-Mesnil (12 min, 10% → 54%)
-
Stop 7:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 44%)
-
Stop 8:
IONITY Village Hotel (10 min, 15% → 49%)
-
Stop 9:
Moto Toddington Northbound (10 min, 15% → 49%)
-
Stop 10:
IONITY Village Hotel (10 min, 13% → 48%)
-
Stop 11:
Supercharger Mountain Park Hotel (17 min, 15% → 70%)
-
Stop 12:
Sir John Rogerson's Quay (10 min, 10% → 19%)
- Arrival: Dublin
MINI Cooper SE 2024 Route
- Start: Madrid (100% charge)
-
Stop 1:
Supercharger Calle Herreros (10 min, 20% → 49%)
-
Stop 2:
Bar Restaurante Lermanda (10 min, 10% → 41%)
-
Stop 3:
Supercharger Telleria Industrialdea (16 min, 14% → 57%)
-
Stop 4:
Supercharger McDonald's (26 min, 10% → 70%)
-
Stop 5:
Aire de Saugon Est (18 min, 10% → 58%)
-
Stop 6:
Supercharger Aire du Poitou-Charentes Nord (16 min, 10% → 55%)
-
Stop 7:
Relais de la Ronde (13 min, 10% → 49%)
-
Stop 8:
Jardiland (27 min, 10% → 71%)
-
Stop 9:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 10:
Aire de Bosc-Mesnil (23 min, 19% → 69%)
-
Stop 11:
Supercharger Eurotunnel Flexiplus Lounge (13 min, 10% → 49%)
-
Stop 12:
IONITY Village Hotel (15 min, 10% → 54%)
-
Stop 13:
Moto Toddington Northbound (18 min, 10% → 58%)
-
Stop 14:
IONITY Village Hotel (15 min, 10% → 54%)
-
Stop 15:
Supercharger Mountain Park Hotel (13 min, 10% → 50%)
-
Stop 16:
Port of Holyhead (19 min, 10% → 50%)
-
Stop 17:
Sir John Rogerson's Quay (10 min, 10% → 27%)
- Arrival: Dublin
Why the Audi e-tron GT Won
The Audi e-tron GT achieved a 123-minute advantage over MINI Cooper SE 2024 on this 2265km route. Key factors:
- Fewer charging stops: 12 stops vs 17 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 38min vs 4h 32min thanks to higher peak charging speeds or better charging curve.
Related Comparisons