In our Oslo to Dublin EV duel, the Audi e-tron GT beats the smart #1 Pro+ by 46 minutes, completing the 2381km route in 29h 57min. The key advantage? 4 fewer charging stops. Route calculated on September 1, 2026 using real-time charging station data.
The Audi e-tron GT needs only 13 charging stops compared to 17 for the slowest vehicle, saving valuable time.
Winner
Audi e-tron GT
- Total time: 29h 57min (46 min faster)
- Charging stops: 13
- Charging time: 2h 40min
- Energy: ~533 kWh
- Distance: 2381km
Quick Comparison
| Metric |
Audi e-tron GT |
smart #1 Pro+ |
| Travel time |
29h 57min |
30h 43min |
| Charging time: |
2h 40min |
3h 24min |
| Charging stops: |
13 |
17 |
| Energy used |
~429 kWh |
~428 kWh |
Charging Strategy Breakdown
Audi e-tron GT Route
- Start: Oslo (100% charge)
-
Stop 1:
Supercharger Importgatan (14 min, 26% → 69%)
-
Stop 2:
Fastned Barbecue barn (13 min, 10% → 57%)
-
Stop 3:
Supercharger Erhvervspark (15 min, 10% → 63%)
-
Stop 4:
Aral Tankstelle Jesteburger Straße (12 min, 10% → 54%)
-
Stop 5:
Supercharger Autohof (11 min, 10% → 51%)
-
Stop 6:
Fastned Van der Valk Hotel (10 min, 10% → 46%)
-
Stop 7:
Fastned De Beerze (10 min, 10% → 46%)
-
Stop 8:
Lukoil Kortrijksesteenweg (15 min, 14% → 65%)
-
Stop 9:
IONITY Channel Gateway (13 min, 10% → 56%)
-
Stop 10:
Supercharger Poplars Garden Centre (10 min, 10% → 46%)
-
Stop 11:
IONITY Village Hotel (10 min, 10% → 46%)
-
Stop 12:
Supercharger Mountain Park Hotel (17 min, 13% → 70%)
-
Stop 13:
Sir John Rogerson's Quay (10 min, 10% → 19%)
- Arrival: Dublin
smart #1 Pro+ Route
- Start: Oslo (100% charge)
-
Stop 1:
Supercharger Importgatan (10 min, 15% → 46%)
-
Stop 2:
McDonald's (10 min, 15% → 48%)
-
Stop 3:
Circle K Kongevejen (10 min, 10% → 45%)
-
Stop 4:
Circle K Tappernøje Vest (12 min, 10% → 50%)
-
Stop 5:
bft Willer (10 min, 10% → 44%)
-
Stop 6:
Selgros Öjendorf (10 min, 10% → 43%)
-
Stop 7:
Daisy's Diner (13 min, 11% → 53%)
-
Stop 8:
Shell Tankstelle Teutopark (11 min, 10% → 48%)
-
Stop 9:
Telekom Bahnhofstraße (10 min, 10% → 46%)
-
Stop 10:
Fastned De Beerze (10 min, 10% → 44%)
-
Stop 11:
Fastned Gentbrugge Nord (14 min, 10% → 56%)
-
Stop 12:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 44%)
-
Stop 13:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 14:
Moto Toddington Northbound (13 min, 10% → 52%)
-
Stop 15:
IONITY Village Hotel (11 min, 10% → 48%)
-
Stop 16:
Supercharger Mountain Park Hotel (28 min, 10% → 80%)
-
Stop 17:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
Why the Audi e-tron GT Won
The Audi e-tron GT achieved a 46-minute advantage over smart #1 Pro+ on this 2381km route. Key factors:
- Fewer charging stops: 13 stops vs 17 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 40min vs 3h 24min thanks to higher peak charging speeds or better charging curve.
Related Comparisons