In our Prague to Lisbon EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 4 E-Tech 150 by 36 minutes, completing the 2690km route in 28h 48min. The key advantage? 1 fewer charging stop. Route calculated on July 19, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 17 charging stops compared to 18 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 28h 48min (36 min faster)
- Charging stops: 17
- Charging time: 3h 39min
- Energy: ~445 kWh
- Distance: 2690km
Quick Comparison
| Metric |
Renault 4 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
29h 24min |
28h 48min |
| Charging time: |
4h 15min |
3h 39min |
| Charging stops: |
18 |
17 |
| Energy used |
~484 kWh |
~484 kWh |
Charging Strategy Breakdown
Renault 4 E-Tech 150 Route
- Start: Prague (100% charge)
-
Stop 1:
Oberpfälzer Alb Nord (10 min, 26% → 54%)
-
Stop 2:
BFS Business Fleet Services (10 min, 11% → 42%)
-
Stop 3:
ATU (10 min, 16% → 47%)
-
Stop 4:
Renchtal West (13 min, 10% → 51%)
-
Stop 5:
Aire de la Porte d’Alsace Nord (21 min, 10% → 68%)
-
Stop 6:
IONITY Aire de Glanon (12 min, 10% → 50%)
-
Stop 7:
Fastned Lieu dit Le Mont (10 min, 10% → 43%)
-
Stop 8:
Aire des Volcans d'Auvergne Ouest (42 min, 10% → 89%)
-
Stop 9:
Supercharger Super U (11 min, 10% → 46%)
-
Stop 10:
Aire Fontbelleau Bayonne Paris (14 min, 10% → 53%)
-
Stop 11:
Supercharger McDonald's (14 min, 10% → 53%)
-
Stop 12:
Supercharger Telleria Industrialdea (14 min, 10% → 54%)
-
Stop 13:
IONITY Briviesca Norte (13 min, 10% → 52%)
-
Stop 14:
Autovía de Castilla (15 min, 10% → 56%)
-
Stop 15:
Avenida Juan Pablo II (11 min, 10% → 45%)
-
Stop 16:
Turismo (12 min, 10% → 48%)
-
Stop 17:
IONITY Castelo Branco Oeste (13 min, 10% → 52%)
-
Stop 18:
Área de Serviço de Santarém Oeste (10 min, 10% → 41%)
- Arrival: Lisbon
Renault Megane E-TECH EV60 optimum charge Route
- Start: Prague (100% charge)
-
Stop 1:
Autohaus Rieger (12 min, 15% → 54%)
-
Stop 2:
Bonfelder Straße (11 min, 10% → 48%)
-
Stop 3:
Renchtal West (11 min, 10% → 48%)
-
Stop 4:
Aire de la Porte d’Alsace Nord (18 min, 10% → 64%)
-
Stop 5:
IONITY Aire de Glanon (10 min, 10% → 47%)
-
Stop 6:
Fastned Lieu dit Le Mont (10 min, 10% → 44%)
-
Stop 7:
Aire des Volcans d'Auvergne Ouest (36 min, 13% → 84%)
-
Stop 8:
Supercharger Super U (10 min, 10% → 45%)
-
Stop 9:
Lidl Avenue Salvador Allende (11 min, 10% → 49%)
-
Stop 10:
Supercharger McDonald's (11 min, 10% → 50%)
-
Stop 11:
Supercharger Telleria Industrialdea (12 min, 10% → 51%)
-
Stop 12:
IONITY Briviesca Norte (11 min, 10% → 49%)
-
Stop 13:
Autovía de Castilla (13 min, 10% → 53%)
-
Stop 14:
Avenida Juan Pablo II (10 min, 10% → 44%)
-
Stop 15:
Turismo (12 min, 12% → 46%)
-
Stop 16:
IONITY Castelo Branco Oeste (11 min, 10% → 49%)
-
Stop 17:
Área de Serviço de Santarém Oeste (10 min, 10% → 44%)
- Arrival: Lisbon
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 36-minute advantage over Renault 4 E-Tech 150 on this 2690km route. Key factors:
- Fewer charging stops: 17 stops vs 18 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 39min vs 4h 15min thanks to higher peak charging speeds or better charging curve.
Related Comparisons