In our Sofia to Oslo EV duel, the MG MG4 64kWh beats the MINI Cooper SE 2024 by 12 minutes, completing the 2612km route in 32h 52min. The key advantage? 1 fewer charging stop. Route calculated on September 2, 2026 using real-time charging station data.
The MG MG4 64kWh needs only 22 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
MG MG4 64kWh
- Total time: 32h 52min (12 min faster)
- Charging stops: 22
- Charging time: 4h 35min
- Energy: ~443 kWh
- Distance: 2612km
Quick Comparison
| Metric |
MG MG4 64kWh |
MINI Cooper SE 2024 |
| Travel time |
32h 52min |
33h 4min |
| Charging time: |
4h 35min |
4h 42min |
| Charging stops: |
22 |
23 |
| Energy used |
~470 kWh |
~470 kWh |
Charging Strategy Breakdown
MG MG4 64kWh Route
- Start: Sofia (100% charge)
-
Stop 1:
Naplatna rampa Nais istočno (18 min, 46% → 76%)
-
Stop 2:
JP Putevi Srbije (10 min, 10% → 40%)
-
Stop 3:
OMV Zemun Park (17 min, 28% → 66%)
-
Stop 4:
BS Gazprom (16 min, 10% → 44%)
-
Stop 5:
IONITY Csalánosi Csárda (11 min, 10% → 44%)
-
Stop 6:
Páty Nord (11 min, 10% → 45%)
-
Stop 7:
IONITY Győr (18 min, 10% → 58%)
-
Stop 8:
Ladná směr Brno (10 min, 10% → 41%)
-
Stop 9:
OC Karlov (13 min, 10% → 49%)
-
Stop 10:
E.ON Naháč (10 min, 10% → 42%)
-
Stop 11:
Redoil (10 min, 10% → 40%)
-
Stop 12:
Esso Tankstelle (10 min, 12% → 43%)
-
Stop 13:
McDonald's (10 min, 10% → 41%)
-
Stop 14:
Shell Tankstelle Hohenzollerndamm (12 min, 10% → 46%)
-
Stop 15:
Supercharger SB Tankstelle (14 min, 10% → 50%)
-
Stop 16:
HEM Tankstelle (10 min, 10% → 40%)
-
Stop 17:
Burger King (18 min, 10% → 59%)
-
Stop 18:
Fastned Barbecue barn (15 min, 10% → 52%)
-
Stop 19:
McDonald's (11 min, 10% → 44%)
-
Stop 20:
Supercharger Importgatan (10 min, 10% → 41%)
-
Stop 21:
Tradenvägen (10 min, 10% → 40%)
-
Stop 22:
Shell Svinesundparken (11 min, 12% → 46%)
- Arrival: Oslo
MINI Cooper SE 2024 Route
- Start: Sofia (100% charge)
-
Stop 1:
Naplatna rampa Nais istočno (10 min, 43% → 61%)
-
Stop 2:
OMV Lapovo sever (15 min, 20% → 51%)
-
Stop 3:
OMV Zemun Park (25 min, 10% → 68%)
-
Stop 4:
BS Gazprom (14 min, 10% → 46%)
-
Stop 5:
IONITY Csalánosi Csárda (11 min, 10% → 45%)
-
Stop 6:
Páty Nord (12 min, 10% → 47%)
-
Stop 7:
IONITY Győr (20 min, 10% → 61%)
-
Stop 8:
Ladná směr Brno (10 min, 10% → 43%)
-
Stop 9:
OC Karlov (13 min, 10% → 50%)
-
Stop 10:
E.ON Naháč (10 min, 10% → 44%)
-
Stop 11:
Kaufland (10 min, 10% → 41%)
-
Stop 12:
Esso Tankstelle (10 min, 12% → 45%)
-
Stop 13:
McDonald's (10 min, 10% → 42%)
-
Stop 14:
Shell Tankstelle Hohenzollerndamm (12 min, 10% → 47%)
-
Stop 15:
Supercharger SB Tankstelle (10 min, 10% → 41%)
-
Stop 16:
Raststätte Recknitz Ost (11 min, 12% → 46%)
-
Stop 17:
Væggerløsevej (10 min, 10% → 41%)
-
Stop 18:
Shell Højgaardsvej (12 min, 27% → 57%)
-
Stop 19:
Fastned Barbecue barn (15 min, 10% → 54%)
-
Stop 20:
McDonald's (11 min, 10% → 45%)
-
Stop 21:
Supercharger Importgatan (10 min, 10% → 42%)
-
Stop 22:
Tradenvägen (10 min, 10% → 41%)
-
Stop 23:
Shell Svinesundparken (11 min, 12% → 47%)
- Arrival: Oslo
Why the MG MG4 64kWh Won
The MG MG4 64kWh achieved a 12-minute advantage over MINI Cooper SE 2024 on this 2612km route. Key factors:
- Fewer charging stops: 22 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 35min vs 4h 42min thanks to higher peak charging speeds or better charging curve.
Related Comparisons