In our Vilnius to Dublin EV duel, the smart #1 Pro+ beats the MG MG4 64kWh by 65 minutes, completing the 2710km route in 32h 21min. The key advantage? 4 fewer charging stops. Route calculated on September 6, 2026 using real-time charging station data.
The MG MG4 64kWh's 360km range doesn't beat the smart #1 Pro+'s 340km here - charging speed and efficiency matter more.
The smart #1 Pro+ needs only 19 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
smart #1 Pro+
- Total time: 32h 21min (65 min faster)
- Charging stops: 19
- Charging time: 4h 5min
- Energy: ~494 kWh
- Distance: 2710km
Quick Comparison
| Metric |
MG MG4 64kWh |
smart #1 Pro+ |
| Travel time |
33h 26min |
32h 21min |
| Charging time: |
5h 7min |
4h 5min |
| Charging stops: |
23 |
19 |
| Energy used |
~488 kWh |
~487 kWh |
Charging Strategy Breakdown
MG MG4 64kWh Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (19 min, 26% → 68%)
-
Stop 2:
Kaufland (17 min, 10% → 39%)
-
Stop 3:
Factory Annopol (11 min, 10% → 45%)
-
Stop 4:
IONITY Nowostawy (13 min, 10% → 48%)
-
Stop 5:
MOP Osiecza (12 min, 10% → 43%)
-
Stop 6:
MOP Dopiewiec (12 min, 10% → 46%)
-
Stop 7:
MOP Walewice (10 min, 10% → 40%)
-
Stop 8:
Aral Tankstelle Friedenstraße (10 min, 15% → 43%)
-
Stop 9:
NORMA (10 min, 11% → 41%)
-
Stop 10:
Shell Recharge Euro Rastpark Irxleben/Hohenwarsleben (11 min, 10% → 43%)
-
Stop 11:
Shell Tankstelle Hämelerwald (10 min, 10% → 41%)
-
Stop 12:
Fastned Rastplatz Löwenburg (12 min, 10% → 46%)
-
Stop 13:
DEX (11 min, 10% → 44%)
-
Stop 14:
McDonald's (11 min, 10% → 43%)
-
Stop 15:
Fastned De Beerze (14 min, 10% → 50%)
-
Stop 16:
Lukoil Kortrijksesteenweg (18 min, 10% → 58%)
-
Stop 17:
Supercharger Eurotunnel Flexiplus Lounge (13 min, 10% → 47%)
-
Stop 18:
IONITY Village Hotel (15 min, 10% → 52%)
-
Stop 19:
Moto Toddington Northbound (17 min, 10% → 56%)
-
Stop 20:
IONITY Village Hotel (15 min, 10% → 52%)
-
Stop 21:
Supercharger Mountain Park Hotel (13 min, 10% → 49%)
-
Stop 22:
Port of Holyhead (23 min, 10% → 48%)
-
Stop 23:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
smart #1 Pro+ Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (12 min, 32% → 63%)
-
Stop 2:
Kaufland (10 min, 10% → 26%)
-
Stop 3:
Shell (10 min, 16% → 46%)
-
Stop 4:
MOP Bolimów (10 min, 10% → 43%)
-
Stop 5:
Gościniec Zacisze (14 min, 10% → 56%)
-
Stop 6:
MOP Dopiewiec (10 min, 10% → 43%)
-
Stop 7:
MOP Walewice (14 min, 10% → 56%)
-
Stop 8:
Circle K Autohof Ferch (15 min, 10% → 58%)
-
Stop 9:
Fastned Rastplatz Uhry Nord (13 min, 10% → 53%)
-
Stop 10:
Fastned Rastplatz Löwenburg (16 min, 10% → 60%)
-
Stop 11:
Shell Tankstelle Grothusstraße (13 min, 10% → 53%)
-
Stop 12:
Fastned De Beerze (10 min, 10% → 44%)
-
Stop 13:
Fastned Gentbrugge Nord (14 min, 10% → 56%)
-
Stop 14:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 44%)
-
Stop 15:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 16:
Moto Toddington Northbound (13 min, 10% → 52%)
-
Stop 17:
IONITY Village Hotel (11 min, 10% → 48%)
-
Stop 18:
Supercharger Mountain Park Hotel (28 min, 10% → 80%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
Why the smart #1 Pro+ Won
The smart #1 Pro+ achieved a 65-minute advantage over MG MG4 64kWh on this 2710km route. Key factors:
- Fewer charging stops: 19 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 5min vs 5h 7min thanks to higher peak charging speeds or better charging curve.
Related Comparisons