In our Vilnius to Dublin EV duel, the VW ID. Buzz Pro LR beats the Renault 4 E-Tech 150 by 18 minutes, completing the 2705km route in 32h 18min. The key advantage? 2 fewer charging stops. Route calculated on September 5, 2026 using real-time charging station data.
The VW ID. Buzz Pro LR needs only 19 charging stops compared to 21 for the slowest vehicle, saving valuable time.
Winner
VW ID. Buzz Pro LR
- Total time: 32h 18min (18 min faster)
- Charging stops: 19
- Charging time: 4h 10min
- Energy: ~598 kWh
- Distance: 2705km
Quick Comparison
| Metric |
Renault 4 E-Tech 150 |
VW ID. Buzz Pro LR |
| Travel time |
32h 36min |
32h 18min |
| Charging time: |
4h 20min |
4h 10min |
| Charging stops: |
21 |
19 |
| Energy used |
~487 kWh |
~488 kWh |
Charging Strategy Breakdown
Renault 4 E-Tech 150 Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (13 min, 30% → 64%)
-
Stop 2:
Kaufland (10 min, 10% → 29%)
-
Stop 3:
Shell (10 min, 19% → 49%)
-
Stop 4:
MOP Bolimów (16 min, 12% → 59%)
-
Stop 5:
MOP Osiecza (10 min, 10% → 41%)
-
Stop 6:
MOP Dopiewiec (15 min, 10% → 55%)
-
Stop 7:
Orlen A2 MOP Gnilec (11 min, 10% → 46%)
-
Stop 8:
Circle K Autohof Ferch (16 min, 10% → 59%)
-
Stop 9:
Fastned Rastplatz Uhry Nord (12 min, 10% → 48%)
-
Stop 10:
IONITY Auetal Nord (10 min, 10% → 43%)
-
Stop 11:
Autohaus Weber (12 min, 10% → 49%)
-
Stop 12:
McDonald's (10 min, 10% → 41%)
-
Stop 13:
BP De Beerze (12 min, 10% → 48%)
-
Stop 14:
Lukoil Kortrijksesteenweg (15 min, 10% → 55%)
-
Stop 15:
ENGIE Eurotunnel Main Terminal (11 min, 10% → 45%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 17:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 18:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 19:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 20:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 21:
Sir John Rogerson's Quay (10 min, 15% → 31%)
- Arrival: Dublin
VW ID. Buzz Pro LR Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (24 min, 39% → 81%)
-
Stop 2:
Factory Annopol (10 min, 10% → 38%)
-
Stop 3:
IONITY Nowostawy (14 min, 10% → 48%)
-
Stop 4:
MOP Skarboszewo (10 min, 10% → 38%)
-
Stop 5:
MOP Dopiewiec (18 min, 17% → 60%)
-
Stop 6:
Autohaus König (11 min, 10% → 42%)
-
Stop 7:
EnBW Schnellladepark (11 min, 10% → 42%)
-
Stop 8:
Fastned Rastplatz Uhry Nord (11 min, 10% → 43%)
-
Stop 9:
IONITY Auetal Nord (10 min, 10% → 39%)
-
Stop 10:
Autohaus Weber (10 min, 10% → 39%)
-
Stop 11:
HPC E.ON Drive Ladepark Beecker Straße (11 min, 10% → 42%)
-
Stop 12:
Fastned De Beerze (11 min, 10% → 43%)
-
Stop 13:
Lukoil Kortrijksesteenweg (14 min, 10% → 49%)
-
Stop 14:
ENGIE Eurotunnel Main Terminal (10 min, 10% → 40%)
-
Stop 15:
IONITY Village Hotel (12 min, 10% → 45%)
-
Stop 16:
Moto Toddington Northbound (13 min, 10% → 47%)
-
Stop 17:
IONITY Village Hotel (12 min, 10% → 44%)
-
Stop 18:
Supercharger Mountain Park Hotel (28 min, 10% → 72%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 19%)
- Arrival: Dublin
Why the VW ID. Buzz Pro LR Won
The VW ID. Buzz Pro LR achieved a 18-minute advantage over Renault 4 E-Tech 150 on this 2705km route. Key factors:
- Fewer charging stops: 19 stops vs 21 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 10min vs 4h 20min thanks to higher peak charging speeds or better charging curve.
Related Comparisons