In our Vilnius to Dublin EV duel, the Renault Megane E-TECH EV60 optimum charge beats the Renault 5 E-Tech 150 by 17 minutes, completing the 2702km route in 32h 2min. The key advantage? 1 fewer charging stop. Route calculated on July 19, 2026 using real-time charging station data.
The Renault Megane E-TECH EV60 optimum charge needs only 17 charging stops compared to 18 for the slowest vehicle, saving valuable time.
Winner
Renault Megane E-TECH EV60 optimum charge
- Total time: 32h 2min (17 min faster)
- Charging stops: 17
- Charging time: 3h 58min
- Energy: ~447 kWh
- Distance: 2702km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
Renault Megane E-TECH EV60 optimum charge |
| Travel time |
32h 19min |
32h 2min |
| Charging time: |
4h 15min |
3h 58min |
| Charging stops: |
18 |
17 |
| Energy used |
~486 kWh |
~487 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (27 min, 30% → 92%)
-
Stop 2:
Factory Annopol (10 min, 10% → 42%)
-
Stop 3:
IONITY Nowostawy (11 min, 10% → 46%)
-
Stop 4:
MOP Osiecza (10 min, 10% → 41%)
-
Stop 5:
MOP Dopiewiec (14 min, 10% → 55%)
-
Stop 6:
Orlen A2 MOP Gnilec (11 min, 10% → 46%)
-
Stop 7:
Circle K Autohof Ferch (16 min, 10% → 59%)
-
Stop 8:
Fastned Rastplatz Uhry Nord (14 min, 10% → 54%)
-
Stop 9:
Fastned Rastplatz Löwenburg (20 min, 10% → 68%)
-
Stop 10:
Telekom Bahnhofstraße (11 min, 10% → 46%)
-
Stop 11:
BP De Beerze (12 min, 10% → 48%)
-
Stop 12:
Lukoil Kortrijksesteenweg (14 min, 10% → 55%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (13 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (27 min, 10% → 82%)
-
Stop 18:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Renault Megane E-TECH EV60 optimum charge Route
- Start: Vilnius (100% charge)
-
Stop 1:
McDonald's Dubowo Drugie (34 min, 35% → 86%)
-
Stop 2:
Factory Annopol (10 min, 10% → 44%)
-
Stop 3:
IONITY Nowostawy (14 min, 14% → 58%)
-
Stop 4:
MOP Chwałszyce (14 min, 10% → 56%)
-
Stop 5:
MOP Walewice (13 min, 10% → 54%)
-
Stop 6:
Circle K Autohof Ferch (14 min, 10% → 56%)
-
Stop 7:
Fastned Rastplatz Uhry Nord (12 min, 10% → 51%)
-
Stop 8:
Fastned Rastplatz Löwenburg (15 min, 10% → 58%)
-
Stop 9:
Shell Tankstelle Grothusstraße (12 min, 10% → 51%)
-
Stop 10:
Fastned De Beerze (10 min, 10% → 45%)
-
Stop 11:
Lukoil Kortrijksesteenweg (12 min, 10% → 52%)
-
Stop 12:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 43%)
-
Stop 13:
IONITY Village Hotel (10 min, 11% → 47%)
-
Stop 14:
Moto Toddington Northbound (11 min, 10% → 50%)
-
Stop 15:
IONITY Village Hotel (10 min, 10% → 47%)
-
Stop 16:
Supercharger Mountain Park Hotel (27 min, 10% → 77%)
-
Stop 17:
Sir John Rogerson's Quay (10 min, 10% → 23%)
- Arrival: Dublin
Why the Renault Megane E-TECH EV60 optimum charge Won
The Renault Megane E-TECH EV60 optimum charge achieved a 17-minute advantage over Renault 5 E-Tech 150 on this 2702km route. Key factors:
- Fewer charging stops: 17 stops vs 18 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 58min vs 4h 15min thanks to higher peak charging speeds or better charging curve.
Related Comparisons