In our Warsaw to Lisbon EV duel, the Renault 5 E-Tech 150 beats the MINI Cooper SE 2024 by 85 minutes, completing the 3326km route in 35h 39min. The key advantage? 7 fewer charging stops. Route calculated on July 19, 2026 using real-time charging station data.
The Renault 5 E-Tech 150 needs only 21 charging stops compared to 28 for the slowest vehicle, saving valuable time.
Winner
Renault 5 E-Tech 150
- Total time: 35h 39min (85 min faster)
- Charging stops: 21
- Charging time: 4h 59min
- Energy: ~524 kWh
- Distance: 3326km
Quick Comparison
| Metric |
MINI Cooper SE 2024 |
Renault 5 E-Tech 150 |
| Travel time |
37h 4min |
35h 39min |
| Charging time: |
6h 3min |
4h 59min |
| Charging stops: |
28 |
21 |
| Energy used |
~599 kWh |
~596 kWh |
Charging Strategy Breakdown
MINI Cooper SE 2024 Route
- Start: Warsaw (100% charge)
-
Stop 1:
MOP Osiecza (10 min, 25% → 51%)
-
Stop 2:
MOP Dopiewiec (10 min, 16% → 48%)
-
Stop 3:
MOP Walewice (10 min, 10% → 41%)
-
Stop 4:
Autohaus König (10 min, 15% → 45%)
-
Stop 5:
Circle K Autohof Ferch (10 min, 18% → 48%)
-
Stop 6:
Shell Recharge Euro Rastpark Irxleben/Hohenwarsleben (10 min, 10% → 42%)
-
Stop 7:
McDonald's (11 min, 10% → 45%)
-
Stop 8:
Fastned Rastplatz Löwenburg (10 min, 10% → 41%)
-
Stop 9:
Autohaus Weber (11 min, 11% → 45%)
-
Stop 10:
Remscheid West (13 min, 10% → 50%)
-
Stop 11:
IONITY Shell Eupen (10 min, 10% → 44%)
-
Stop 12:
Supercharger ibis Styles (12 min, 10% → 47%)
-
Stop 13:
Aire de La Sentinelle Ouest (13 min, 10% → 49%)
-
Stop 14:
Aire de Ressons Ouest (14 min, 10% → 51%)
-
Stop 15:
Aire de Limours-Janvry (19 min, 10% → 60%)
-
Stop 16:
Warsemann Automobiles (10 min, 10% → 41%)
-
Stop 17:
Aire de Ste Maure de Touraine (19 min, 11% → 60%)
-
Stop 18:
Fastned Aire des Groies (19 min, 10% → 60%)
-
Stop 19:
Aire Fontbelleau Paris Bayonne (15 min, 10% → 54%)
-
Stop 20:
Aire de l'Océan Ouest (19 min, 10% → 60%)
-
Stop 21:
Supercharger Telleria Industrialdea (18 min, 10% → 59%)
-
Stop 22:
IONITY Briviesca Norte (11 min, 10% → 45%)
-
Stop 23:
Area El Canto (10 min, 10% → 41%)
-
Stop 24:
Supercharger Rio Shopping (11 min, 18% → 51%)
-
Stop 25:
Avenida Juan Pablo II (13 min, 10% → 49%)
-
Stop 26:
Turismo (25 min, 10% → 68%)
-
Stop 27:
Área de serviço Vila Velha Ródão oeste (10 min, 10% → 41%)
-
Stop 28:
Área de Serviço de Santarém Oeste (10 min, 10% → 42%)
- Arrival: Lisbon
Renault 5 E-Tech 150 Route
- Start: Warsaw (100% charge)
-
Stop 1:
Orlen A2 MOP Tulce (13 min, 10% → 52%)
-
Stop 2:
MOP Walewice (15 min, 10% → 57%)
-
Stop 3:
Circle K Autohof Ferch (16 min, 10% → 59%)
-
Stop 4:
Fastned Rastplatz Uhry Nord (14 min, 10% → 54%)
-
Stop 5:
Fastned Rastplatz Löwenburg (18 min, 10% → 63%)
-
Stop 6:
Ehrenberg West (18 min, 10% → 63%)
-
Stop 7:
IONITY Bierset (16 min, 10% → 59%)
-
Stop 8:
Aire de La Sentinelle Ouest (17 min, 10% → 61%)
-
Stop 9:
IONITY Novotel Roissy Saint-Witz (13 min, 10% → 53%)
-
Stop 10:
IONITY McDonald's (15 min, 10% → 58%)
-
Stop 11:
Aire de Ste Maure de Touraine (14 min, 10% → 55%)
-
Stop 12:
Fastned Aire des Groies (14 min, 10% → 55%)
-
Stop 13:
Aire Fontbelleau Paris Bayonne (12 min, 10% → 49%)
-
Stop 14:
Aire de l'Océan Ouest (14 min, 10% → 55%)
-
Stop 15:
Supercharger Telleria Industrialdea (14 min, 10% → 54%)
-
Stop 16:
IONITY Briviesca Norte (10 min, 10% → 42%)
-
Stop 17:
Area El Canto (10 min, 10% → 41%)
-
Stop 18:
Parking Calle Miravete (14 min, 18% → 61%)
-
Stop 19:
IONITY Cepsa (19 min, 10% → 66%)
-
Stop 20:
IONITY Castelo Branco Oeste (13 min, 10% → 52%)
-
Stop 21:
Área de Serviço de Santarém Oeste (10 min, 10% → 41%)
- Arrival: Lisbon
Why the Renault 5 E-Tech 150 Won
The Renault 5 E-Tech 150 achieved a 85-minute advantage over MINI Cooper SE 2024 on this 3326km route. Key factors:
- Fewer charging stops: 21 stops vs 28 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 59min vs 6h 3min thanks to higher peak charging speeds or better charging curve.
Related Comparisons