In our Warsaw to London EV duel, the Aiways U5 beats the Citroën ë-Jumpy 50kWh by 89 minutes, completing the 1638km route in 18h 18min. The key advantage? 7 fewer charging stops. Route calculated on September 4, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 18h 18min (89 min faster)
- Charging stops: 12
- Charging time: 2h 42min
- Energy: ~307 kWh
- Distance: 1638km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 50kWh |
| Travel time |
18h 18min |
19h 47min |
| Charging time: |
2h 42min |
4h 2min |
| Charging stops: |
12 |
19 |
| Energy used |
~295 kWh |
~296 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Warsaw (100% charge)
-
Stop 1:
MOP Chwałszyce (20 min, 15% → 61%)
-
Stop 2:
MOP Walewice (10 min, 10% → 37%)
-
Stop 3:
Autohaus König (13 min, 13% → 48%)
-
Stop 4:
EnBW Schnellladepark (14 min, 10% → 48%)
-
Stop 5:
Fastned Rastplatz Uhry Nord (14 min, 10% → 49%)
-
Stop 6:
IONITY Auetal Nord (12 min, 10% → 44%)
-
Stop 7:
Autohaus Weber (15 min, 10% → 50%)
-
Stop 8:
McDonald's (11 min, 10% → 42%)
-
Stop 9:
BP De Beerze (14 min, 10% → 49%)
-
Stop 10:
Lukoil Kortrijksesteenweg (19 min, 10% → 57%)
-
Stop 11:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 37%)
-
Stop 12:
IONITY Channel Gateway (10 min, 16% → 43%)
- Arrival: London
Citroën ë-Jumpy 50kWh Route
- Start: Warsaw (100% charge)
-
Stop 1:
MOP Kozanki (10 min, 12% → 30%)
-
Stop 2:
MOP Kuny (10 min, 12% → 37%)
-
Stop 3:
MOP Skarboszewo (11 min, 11% → 51%)
-
Stop 4:
MOP Dopiewiec (22 min, 10% → 70%)
-
Stop 5:
MOP Walewice (11 min, 10% → 51%)
-
Stop 6:
Autohaus König (12 min, 10% → 53%)
-
Stop 7:
Circle K Autohof Ferch (10 min, 10% → 48%)
-
Stop 8:
McDonald's Euro Rastpark Theeßen (14 min, 10% → 59%)
-
Stop 9:
Fastned Rastplatz Uhry Nord (11 min, 10% → 50%)
-
Stop 10:
HEM Tankstelle Lahe (11 min, 10% → 50%)
-
Stop 11:
Fastned Rastplatz Löwenburg (13 min, 10% → 57%)
-
Stop 12:
Autohaus Weber (13 min, 10% → 55%)
-
Stop 13:
Shell Tankstelle Grothusstraße (13 min, 10% → 57%)
-
Stop 14:
IONITY La Place / Gr8 Hotel (11 min, 10% → 51%)
-
Stop 15:
Fastned Oud-Turnhout Noord (16 min, 10% → 62%)
-
Stop 16:
Fastned Gentbrugge Nord (10 min, 10% → 47%)
-
Stop 17:
Fastned Oostendse Baan (15 min, 10% → 60%)
-
Stop 18:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 46%)
-
Stop 19:
IONITY Channel Gateway (19 min, 10% → 66%)
- Arrival: London
Why the Aiways U5 Won
The Aiways U5 achieved a 89-minute advantage over Citroën ë-Jumpy 50kWh on this 1638km route. Key factors:
- Fewer charging stops: 12 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 42min vs 4h 2min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~307 kWh vs ~407 kWh) means less time spent charging.
Related Comparisons