In our Warsaw to Paris EV duel, the Aiways U5 beats the Citroën ë-Jumpy 75kWh by 67 minutes, completing the 1595km route in 17h 0min. The key advantage? 2 fewer charging stops. Route calculated on September 3, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 14 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 17h 0min (67 min faster)
- Charging stops: 12
- Charging time: 2h 33min
- Energy: ~299 kWh
- Distance: 1595km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 75kWh |
| Travel time |
17h 0min |
18h 7min |
| Charging time: |
2h 33min |
3h 39min |
| Charging stops: |
12 |
14 |
| Energy used |
~287 kWh |
~287 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Warsaw (100% charge)
-
Stop 1:
MOP Chwałszyce (20 min, 15% → 61%)
-
Stop 2:
MOP Walewice (10 min, 10% → 37%)
-
Stop 3:
Autohaus König (13 min, 13% → 48%)
-
Stop 4:
EnBW Schnellladepark (14 min, 10% → 48%)
-
Stop 5:
Fastned Rastplatz Uhry Nord (14 min, 10% → 49%)
-
Stop 6:
IONITY Auetal Nord (12 min, 10% → 44%)
-
Stop 7:
Autohaus Weber (11 min, 10% → 42%)
-
Stop 8:
Remscheid West (13 min, 10% → 47%)
-
Stop 9:
IONITY Shell Eupen (11 min, 10% → 41%)
-
Stop 10:
Supercharger ibis Styles (12 min, 10% → 44%)
-
Stop 11:
Aire de La Sentinelle Ouest (13 min, 10% → 46%)
-
Stop 12:
Aire de Ressons Ouest (10 min, 10% → 37%)
- Arrival: Paris
Citroën ë-Jumpy 75kWh Route
- Start: Warsaw (100% charge)
-
Stop 1:
MOP Osiecza (14 min, 16% → 49%)
-
Stop 2:
MOP Dopiewiec (18 min, 10% → 52%)
-
Stop 3:
MOP Walewice (12 min, 10% → 39%)
-
Stop 4:
Autohaus König (12 min, 10% → 40%)
-
Stop 5:
Circle K Autohof Ferch (18 min, 10% → 53%)
-
Stop 6:
Shell Recharge Euro Rastpark Irxleben/Hohenwarsleben (16 min, 10% → 49%)
-
Stop 7:
Shell Tankstelle Hämelerwald (15 min, 10% → 46%)
-
Stop 8:
Fastned Rastplatz Löwenburg (13 min, 10% → 43%)
-
Stop 9:
Autohaus Weber (16 min, 10% → 49%)
-
Stop 10:
Remscheid West (20 min, 10% → 55%)
-
Stop 11:
IONITY Shell Eupen (16 min, 10% → 48%)
-
Stop 12:
Supercharger ibis Styles (17 min, 10% → 51%)
-
Stop 13:
Aire de La Sentinelle Ouest (19 min, 10% → 54%)
-
Stop 14:
Aire de Ressons Ouest (13 min, 10% → 42%)
- Arrival: Paris
Why the Aiways U5 Won
The Aiways U5 achieved a 67-minute advantage over Citroën ë-Jumpy 75kWh on this 1595km route. Key factors:
- Fewer charging stops: 12 stops vs 14 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 33min vs 3h 39min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~299 kWh vs ~425 kWh) means less time spent charging.
Related Comparisons