In our Zagreb to Bern EV duel, the smart #1 Pro beats the MG MG4 64kWh by 37 minutes, completing the 900km route in 10h 20min. The key advantage? 1 fewer charging stop. Route calculated on September 4, 2026 using real-time charging station data.
The MG MG4 64kWh's 360km range doesn't beat the smart #1 Pro's 240km here - charging speed and efficiency matter more.
The smart #1 Pro needs only 4 charging stops compared to 5 for the slowest vehicle, saving valuable time.
Winner
smart #1 Pro
- Total time: 10h 20min (37 min faster)
- Charging stops: 4
- Charging time: 52min
- Energy: ~176 kWh
- Distance: 900km
Quick Comparison
| Metric |
MG MG4 64kWh |
smart #1 Pro |
| Travel time |
10h 57min |
10h 20min |
| Charging time: |
1h 28min |
52min |
| Charging stops: |
5 |
4 |
| Energy used |
~162 kWh |
~161 kWh |
Charging Strategy Breakdown
MG MG4 64kWh Route
- Start: Zagreb (100% charge)
-
Stop 1:
Lom west (Ljubljana - Koper) (21 min, 46% → 74%)
-
Stop 2:
Be Charge Bazzera Nord (19 min, 10% → 58%)
-
Stop 3:
Electriease Monte Alto Nord (14 min, 10% → 50%)
-
Stop 4:
Via Sumatra (23 min, 10% → 66%)
-
Stop 5:
ACW Auto-Center Visp (11 min, 10% → 44%)
- Arrival: Bern
smart #1 Pro Route
- Start: Zagreb (100% charge)
-
Stop 1:
Lom west (Ljubljana - Koper) (10 min, 51% → 68%)
-
Stop 2:
Be Charge Bazzera Nord (17 min, 10% → 70%)
-
Stop 3:
Electra Via Carlo Cattaneo (13 min, 10% → 62%)
-
Stop 4:
Supercharger Centro Calzaturiero (12 min, 10% → 59%)
- Arrival: Bern
Why the smart #1 Pro Won
The smart #1 Pro achieved a 37-minute advantage over MG MG4 64kWh on this 900km route. Key factors:
- Fewer charging stops: 4 stops vs 5 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 52min vs 1h 28min thanks to higher peak charging speeds or better charging curve.
Related Comparisons