In our Zagreb to Lisbon EV duel, the smart #1 Pro+ beats the MINI Cooper SE 2024 by 74 minutes, completing the 2739km route in 29h 58min. The key advantage? 7 fewer charging stops. Route calculated on July 19, 2026 using real-time charging station data.
The smart #1 Pro+ needs only 16 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
smart #1 Pro+
- Total time: 29h 58min (74 min faster)
- Charging stops: 16
- Charging time: 4h 10min
- Energy: ~499 kWh
- Distance: 2739km
Quick Comparison
| Metric |
MINI Cooper SE 2024 |
smart #1 Pro+ |
| Travel time |
31h 12min |
29h 58min |
| Charging time: |
4h 52min |
4h 10min |
| Charging stops: |
23 |
16 |
| Energy used |
~493 kWh |
~493 kWh |
Charging Strategy Breakdown
MINI Cooper SE 2024 Route
- Start: Zagreb (100% charge)
-
Stop 1:
Smatrics Risparmio Casa (10 min, 14% → 44%)
-
Stop 2:
Bazzera Nord (19 min, 11% → 61%)
-
Stop 3:
Electriease Monte Alto Nord (12 min, 10% → 47%)
-
Stop 4:
Conad (16 min, 10% → 51%)
-
Stop 5:
Area di Servizio Stura Ovest (17 min, 10% → 57%)
-
Stop 6:
Castellaro Nord (10 min, 10% → 41%)
-
Stop 7:
IONITY Aire de Bréguières Nord (10 min, 10% → 41%)
-
Stop 8:
Aire de Vidauban Nord (10 min, 20% → 49%)
-
Stop 9:
Aire de Lançon de Provence Est (11 min, 11% → 47%)
-
Stop 10:
Aire de Nabrigas (10 min, 10% → 41%)
-
Stop 11:
Aire De Lespignan Nord (12 min, 10% → 48%)
-
Stop 12:
Supercharger Ibis Budget (15 min, 10% → 53%)
-
Stop 13:
Lidl (15 min, 10% → 53%)
-
Stop 14:
Supercharger Super-U (10 min, 10% → 41%)
-
Stop 15:
IONITY Hastingues Nord (10 min, 21% → 49%)
-
Stop 16:
Supercharger Telleria Industrialdea (18 min, 11% → 59%)
-
Stop 17:
IONITY Briviesca Norte (11 min, 10% → 45%)
-
Stop 18:
Area El Canto (10 min, 10% → 41%)
-
Stop 19:
Parking Calle Miravete (11 min, 16% → 49%)
-
Stop 20:
Avenida Juan Pablo II (13 min, 10% → 49%)
-
Stop 21:
Turismo (15 min, 10% → 53%)
-
Stop 22:
IONITY Castelo Branco Oeste (17 min, 10% → 57%)
-
Stop 23:
Área de Serviço de Santarém Oeste (10 min, 10% → 42%)
- Arrival: Lisbon
smart #1 Pro+ Route
- Start: Zagreb (100% charge)
-
Stop 1:
Lom west (Ljubljana - Koper) (12 min, 51% → 68%)
-
Stop 2:
Be Charge Bazzera Nord (15 min, 10% → 54%)
-
Stop 3:
Electriease Monte Alto Nord (27 min, 10% → 77%)
-
Stop 4:
Area di Servizio Stura Ovest (12 min, 10% → 51%)
-
Stop 5:
Castellaro Nord (16 min, 10% → 56%)
-
Stop 6:
Aire de Vidauban Nord (20 min, 10% → 67%)
-
Stop 7:
Rue John Mac Adam (10 min, 10% → 46%)
-
Stop 8:
Aire De Lespignan Nord (18 min, 10% → 64%)
-
Stop 9:
IONITY Aire du Volvestre (17 min, 10% → 62%)
-
Stop 10:
Supercharger Super-U (16 min, 10% → 60%)
-
Stop 11:
Supercharger Telleria Industrialdea (13 min, 10% → 53%)
-
Stop 12:
IONITY Briviesca Norte (12 min, 10% → 51%)
-
Stop 13:
Autovía de Castilla (22 min, 10% → 71%)
-
Stop 14:
IONITY Cepsa (18 min, 10% → 64%)
-
Stop 15:
IONITY Castelo Branco Oeste (12 min, 10% → 51%)
-
Stop 16:
Área de Serviço de Santarém Oeste (10 min, 10% → 43%)
- Arrival: Lisbon
Why the smart #1 Pro+ Won
The smart #1 Pro+ achieved a 74-minute advantage over MINI Cooper SE 2024 on this 2739km route. Key factors:
- Fewer charging stops: 16 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 10min vs 4h 52min thanks to higher peak charging speeds or better charging curve.
Related Comparisons