In our Bratislava to London EV duel, the Aiways U5 beats the Citroën ë-Jumpy 50kWh by 76 minutes, completing the 1542km route in 17h 35min. The key advantage? 7 fewer charging stops. Route calculated on September 1, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 19 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 17h 35min (76 min faster)
- Charging stops: 12
- Charging time: 2h 25min
- Energy: ~289 kWh
- Distance: 1542km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 50kWh |
| Travel time |
17h 35min |
18h 51min |
| Charging time: |
2h 25min |
3h 36min |
| Charging stops: |
12 |
19 |
| Energy used |
~278 kWh |
~279 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Bratislava (100% charge)
-
Stop 1:
Raststation Aistersheim (10 min, 11% → 39%)
-
Stop 2:
EDEKA Hartmannsgruber Lagerhausstraße (15 min, 10% → 50%)
-
Stop 3:
Mer McDonald's (13 min, 10% → 46%)
-
Stop 4:
Aral Tankstelle (10 min, 10% → 40%)
-
Stop 5:
PWC Rastanlage Kohlsberg Nord (11 min, 10% → 42%)
-
Stop 6:
Medenbach Ost (10 min, 10% → 40%)
-
Stop 7:
Raststätte Epgert (14 min, 10% → 48%)
-
Stop 8:
IONITY Aachener Land Nord (10 min, 10% → 39%)
-
Stop 9:
Hotel Prins van Oranje (13 min, 10% → 46%)
-
Stop 10:
Lukoil Kortrijksesteenweg (19 min, 10% → 57%)
-
Stop 11:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 37%)
-
Stop 12:
IONITY Channel Gateway (10 min, 16% → 43%)
- Arrival: London
Citroën ë-Jumpy 50kWh Route
- Start: Bratislava (100% charge)
-
Stop 1:
Rastplatz Roggendorf (10 min, 21% → 54%)
-
Stop 2:
Shell Raststation Strengberg (10 min, 21% → 54%)
-
Stop 3:
eCarUp Pendlerparkplatz (10 min, 13% → 48%)
-
Stop 4:
Donautal Ost (10 min, 10% → 46%)
-
Stop 5:
IONITY Bayerischer Wald Nord (10 min, 11% → 48%)
-
Stop 6:
Total Tankstelle (10 min, 10% → 46%)
-
Stop 7:
Aral Tankstelle Nürnberger Straße 23 (10 min, 14% → 50%)
-
Stop 8:
Aral Tankstelle (13 min, 10% → 55%)
-
Stop 9:
Euro Hotel (10 min, 10% → 46%)
-
Stop 10:
Aral Tankstelle Aschaffenburger Straße (12 min, 17% → 57%)
-
Stop 11:
mblty Bad Camberg Ost (10 min, 10% → 48%)
-
Stop 12:
Raststätte Epgert (11 min, 10% → 52%)
-
Stop 13:
Frechen Nord (14 min, 10% → 59%)
-
Stop 14:
Fastned Carpool Maasmechelen (12 min, 10% → 53%)
-
Stop 15:
JBC (10 min, 10% → 47%)
-
Stop 16:
IONITY Wetteren Nord (10 min, 10% → 49%)
-
Stop 17:
Fastned Oostendse Baan (15 min, 10% → 60%)
-
Stop 18:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 46%)
-
Stop 19:
IONITY Channel Gateway (19 min, 10% → 66%)
- Arrival: London
Why the Aiways U5 Won
The Aiways U5 achieved a 76-minute advantage over Citroën ë-Jumpy 50kWh on this 1542km route. Key factors:
- Fewer charging stops: 12 stops vs 19 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 25min vs 3h 36min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~289 kWh vs ~383 kWh) means less time spent charging.
Related Comparisons