In our Dublin to Rome EV duel, the Renault 4 E-Tech 150 beats the Fiat 500e 42kWh by 113 minutes, completing the 2324km route in 29h 58min. The key advantage? 8 fewer charging stops. Route calculated on September 5, 2026 using real-time charging station data.
The Renault 4 E-Tech 150 needs only 15 charging stops compared to 23 for the slowest vehicle, saving valuable time.
Winner
Renault 4 E-Tech 150
- Total time: 29h 58min (113 min faster)
- Charging stops: 15
- Charging time: 3h 28min
- Energy: ~370 kWh
- Distance: 2324km
Quick Comparison
| Metric |
Fiat 500e 42kWh |
Renault 4 E-Tech 150 |
| Travel time |
31h 51min |
29h 58min |
| Charging time: |
5h 12min |
3h 28min |
| Charging stops: |
23 |
15 |
| Energy used |
~418 kWh |
~418 kWh |
Charging Strategy Breakdown
Fiat 500e 42kWh Route
- Start: Dublin (100% charge)
-
Stop 1:
Euro Garages (10 min, 33% → 53%)
-
Stop 2:
Eurogarages (18 min, 10% → 46%)
-
Stop 3:
IONITY Village Hotel (10 min, 10% → 43%)
-
Stop 4:
Watford Gap Services Southbound (10 min, 10% → 42%)
-
Stop 5:
Moto Toddington Southbound (11 min, 16% → 51%)
-
Stop 6:
IONITY DoubleTree by Hilton Dartford Bridge (10 min, 10% → 44%)
-
Stop 7:
ENGIE Eurotunnel (19 min, 10% → 62%)
-
Stop 8:
IONITY Aire de Rely (10 min, 10% → 42%)
-
Stop 9:
IONITY Aire de Baralle (16 min, 14% → 59%)
-
Stop 10:
Aire de Mont de Nizy (29 min, 10% → 74%)
-
Stop 11:
Schnellladesäule (10 min, 10% → 32%)
-
Stop 12:
Aire de Toul Dommartin (14 min, 12% → 53%)
-
Stop 13:
Fastned Rue de la Madeleine (21 min, 10% → 65%)
-
Stop 14:
GOFAST Basel-Ost (15 min, 10% → 55%)
-
Stop 15:
Migrol Rotzlochstrasse (10 min, 10% → 42%)
-
Stop 16:
GoFast Area Servizio Gottardo Sud (11 min, 10% → 46%)
-
Stop 17:
GOFAST Swissminiatur (10 min, 10% → 42%)
-
Stop 18:
Muggiano Ovest (14 min, 14% → 55%)
-
Stop 19:
Roadhouse (15 min, 10% → 56%)
-
Stop 20:
Cantagallo Ovest (10 min, 10% → 42%)
-
Stop 21:
Ristorante Goyo (11 min, 10% → 46%)
-
Stop 22:
Area Servizio Badia al Pino Ovest (17 min, 10% → 60%)
-
Stop 23:
Giove Ovest (11 min, 10% → 47%)
- Arrival: Rome
Renault 4 E-Tech 150 Route
- Start: Dublin (100% charge)
-
Stop 1:
Supercharger Menai Science Park (10 min, 54% → 73%)
-
Stop 2:
IONITY Village Hotel (13 min, 11% → 53%)
-
Stop 3:
Moto Toddington Southbound (13 min, 10% → 52%)
-
Stop 4:
IONITY Maidstone (17 min, 10% → 61%)
-
Stop 5:
IONITY Aire de Rely (20 min, 10% → 67%)
-
Stop 6:
Aire de Mont de Nizy (23 min, 10% → 72%)
-
Stop 7:
Aire de Toul Dommartin (10 min, 10% → 41%)
-
Stop 8:
Fastned Rue de la Madeleine (12 min, 10% → 50%)
-
Stop 9:
GOFAST Basel-Ost (15 min, 10% → 55%)
-
Stop 10:
Rastplatz Amsteg (12 min, 10% → 48%)
-
Stop 11:
GOFAST Swissminiatur (13 min, 10% → 51%)
-
Stop 12:
Giornali Lotto Bar Sport (10 min, 10% → 43%)
-
Stop 13:
Secchia Ovest (11 min, 10% → 47%)
-
Stop 14:
Ristorante Goyo (15 min, 10% → 57%)
-
Stop 15:
Area di Servizio Fabro Ovest (14 min, 10% → 53%)
- Arrival: Rome
Why the Renault 4 E-Tech 150 Won
The Renault 4 E-Tech 150 achieved a 113-minute advantage over Fiat 500e 42kWh on this 2324km route. Key factors:
- Fewer charging stops: 15 stops vs 23 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 28min vs 5h 12min thanks to higher peak charging speeds or better charging curve.
Related Comparisons