In our Madrid to Dublin EV duel, the Renault 5 E-Tech 150 ties with the VW ID.4 Pro 2023, completing the 2294km route in 28h 0min. The key advantage? 2 fewer charging stops. Route calculated on September 5, 2026 using real-time charging station data.
The Renault 5 E-Tech 150 needs only 13 charging stops compared to 15 for the slowest vehicle, saving valuable time.
Winner
Renault 5 E-Tech 150
- Total time: 28h 0min (0 min faster)
- Charging stops: 13
- Charging time: 3h 38min
- Energy: ~361 kWh
- Distance: 2294km
Quick Comparison
| Metric |
Renault 5 E-Tech 150 |
VW ID.4 Pro 2023 |
| Travel time |
28h 0min |
28h 0min |
| Charging time: |
3h 38min |
3h 15min |
| Charging stops: |
13 |
15 |
| Energy used |
~413 kWh |
~409 kWh |
Charging Strategy Breakdown
Renault 5 E-Tech 150 Route
- Start: Madrid (100% charge)
-
Stop 1:
IONITY Briviesca Sur (12 min, 15% → 54%)
-
Stop 2:
Supercharger Telleria Industrialdea (18 min, 10% → 65%)
-
Stop 3:
Supercharger E.Leclerc Express (13 min, 10% → 51%)
-
Stop 4:
Aire de Saugon Est (24 min, 10% → 76%)
-
Stop 5:
IONITY Aire de Poitiers Chincé (20 min, 10% → 69%)
-
Stop 6:
Jardiland (28 min, 10% → 84%)
-
Stop 7:
Aire de Bosc-Mesnil (18 min, 10% → 63%)
-
Stop 8:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 9:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 10:
Moto Toddington Northbound (13 min, 10% → 53%)
-
Stop 11:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 12:
Supercharger Mountain Park Hotel (27 min, 10% → 82%)
-
Stop 13:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
VW ID.4 Pro 2023 Route
- Start: Madrid (100% charge)
-
Stop 1:
IONITY Briviesca Sur (10 min, 30% → 55%)
-
Stop 2:
Supercharger Telleria Industrialdea (10 min, 18% → 45%)
-
Stop 3:
Supercharger McDonald's (17 min, 10% → 55%)
-
Stop 4:
Aire de Saugon Est (10 min, 10% → 37%)
-
Stop 5:
Supercharger Hyper U (16 min, 19% → 60%)
-
Stop 6:
Relais de la Ronde (10 min, 10% → 39%)
-
Stop 7:
Jardiland (10 min, 10% → 37%)
-
Stop 8:
Aire de la Dentelle d'Alençon (14 min, 24% → 59%)
-
Stop 9:
Aire de Bosc-Mesnil (16 min, 10% → 54%)
-
Stop 10:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 10% → 37%)
-
Stop 11:
IONITY Channel Gateway (13 min, 20% → 55%)
-
Stop 12:
Supercharger Poplars Garden Centre (12 min, 10% → 45%)
-
Stop 13:
IONITY Village Hotel (11 min, 10% → 42%)
-
Stop 14:
Supercharger Mountain Park Hotel (26 min, 10% → 69%)
-
Stop 15:
Sir John Rogerson's Quay (10 min, 10% → 20%)
- Arrival: Dublin
Why the Renault 5 E-Tech 150 Won
All vehicles completed this route in the same time, making it a tie.
Related Comparisons