In our Paris to Madrid EV duel, the Aiways U5 beats the Citroën ë-Jumpy 75kWh by 67 minutes, completing the 1253km route in 14h 11min. The key advantage? 3 fewer charging stops. Route calculated on September 1, 2026 using real-time charging station data.
The Aiways U5 needs only 8 charging stops compared to 11 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 14h 11min (67 min faster)
- Charging stops: 8
- Charging time: 1h 58min
- Energy: ~235 kWh
- Distance: 1253km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 75kWh |
| Travel time |
14h 11min |
15h 18min |
| Charging time: |
1h 58min |
2h 56min |
| Charging stops: |
8 |
11 |
| Energy used |
~226 kWh |
~226 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: Paris (100% charge)
-
Stop 1:
Aire de Ste Maure de Touraine, Saint-Épain (16 min, 17% → 56%)
-
Stop 2:
Fastned Aire des Groies, Courcôme (18 min, 10% → 56%)
-
Stop 3:
Aire Fontbelleau Paris Bayonne, Lormont (17 min, 10% → 54%)
-
Stop 4:
Supercharger McDonald's, Castets (17 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea, Zestoa (10 min, 10% → 37%)
-
Stop 6:
Repsol Lopidana, Vitoria-Gasteiz (12 min, 14% → 47%)
-
Stop 7:
Supercharger Calle Herreros, Villagonzalo Pedernales (17 min, 10% → 53%)
-
Stop 8:
Gasolinera Mirasierra, Santo Tomé del Puerto (11 min, 10% → 42%)
- Arrival: Madrid
Citroën ë-Jumpy 75kWh Route
- Start: Paris (100% charge)
-
Stop 1:
IONITY Aire de Tours La Longue Vue, Monnaie (10 min, 14% → 37%)
-
Stop 2:
Aire de Ste Maure de Touraine, Saint-Épain (22 min, 22% → 64%)
-
Stop 3:
Supercharger N10, Ruffec (19 min, 10% → 54%)
-
Stop 4:
IONITY Aire de Bédenac Ouest, Bedenac (10 min, 10% → 33%)
-
Stop 5:
Supercharger Centre commercial Rives d'Arcins, Bègles (20 min, 14% → 59%)
-
Stop 6:
Supercharger McDonald's, Castets (10 min, 10% → 33%)
-
Stop 7:
IONITY Aire de Labenne Ouest, Labenne (13 min, 15% → 46%)
-
Stop 8:
Supercharger Telleria Industrialdea, Zestoa (11 min, 10% → 38%)
-
Stop 9:
Repsol Lopidana, Vitoria-Gasteiz (20 min, 10% → 55%)
-
Stop 10:
Supercharger Calle Herreros, Villagonzalo Pedernales (25 min, 10% → 62%)
-
Stop 11:
Gasolinera Mirasierra, Santo Tomé del Puerto (16 min, 10% → 48%)
- Arrival: Madrid
Why the Aiways U5 Won
The Aiways U5 achieved a 67-minute advantage over Citroën ë-Jumpy 75kWh on this 1253km route. Key factors:
- Fewer charging stops: 8 stops vs 11 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 1h 58min vs 2h 56min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~235 kWh vs ~333 kWh) means less time spent charging.
Related Comparisons