In our Vienna to Rome EV duel, the Renault 5 E-Tech 150 beats the MG MG4 64kWh by 18 minutes, completing the 1095km route in 11h 46min. The key advantage? 2 fewer charging stops. Route calculated on September 6, 2026 using real-time charging station data.
The MG MG4 64kWh's 360km range doesn't beat the Renault 5 E-Tech 150's 330km here - charging speed and efficiency matter more.
The Renault 5 E-Tech 150 needs only 6 charging stops compared to 8 for the slowest vehicle, saving valuable time.
Winner
Renault 5 E-Tech 150
- Total time: 11h 46min (18 min faster)
- Charging stops: 6
- Charging time: 1h 17min
- Energy: ~173 kWh
- Distance: 1095km
Quick Comparison
| Metric |
MG MG4 64kWh |
Renault 5 E-Tech 150 |
| Travel time |
12h 4min |
11h 46min |
| Charging time: |
1h 34min |
1h 17min |
| Charging stops: |
8 |
6 |
| Energy used |
~197 kWh |
~197 kWh |
Charging Strategy Breakdown
MG MG4 64kWh Route
- Start: Vienna (100% charge)
-
Stop 1:
OMV Tankstelle, Neumarkt in der Steiermark (10 min, 21% → 47%)
-
Stop 2:
Electra Pizza Plus, Villach (10 min, 17% → 45%)
-
Stop 3:
Ledra Ovest, Colloredo di Monte Albano (15 min, 10% → 53%)
-
Stop 4:
Supercharger Centro Commerciale Porte di Mestre, Venezia (15 min, 10% → 53%)
-
Stop 5:
Castel Bentivoglio Ovest, Bentivoglio (11 min, 10% → 44%)
-
Stop 6:
Ristorante Goyo, Calenzano (10 min, 10% → 40%)
-
Stop 7:
Area Servizio Badia al Pino Ovest, Badia al Pino (13 min, 12% → 49%)
-
Stop 8:
Giove Ovest, Giove (10 min, 10% → 40%)
- Arrival: Rome
Renault 5 E-Tech 150 Route
- Start: Vienna (100% charge)
-
Stop 1:
Hofer Völkermarkter Straße, St. Veit an der Glan (14 min, 14% → 58%)
-
Stop 2:
Ledra Ovest, Colloredo di Monte Albano (13 min, 10% → 51%)
-
Stop 3:
Supercharger Centro Commerciale Porte di Mestre, Venezia (12 min, 10% → 50%)
-
Stop 4:
Castel Bentivoglio Ovest, Bentivoglio (10 min, 10% → 42%)
-
Stop 5:
Ristorante Goyo, Calenzano (15 min, 10% → 57%)
-
Stop 6:
Area di Servizio Fabro Ovest, Fabro (13 min, 10% → 53%)
- Arrival: Rome
Why the Renault 5 E-Tech 150 Won
The Renault 5 E-Tech 150 achieved a 18-minute advantage over MG MG4 64kWh on this 1095km route. Key factors:
- Fewer charging stops: 6 stops vs 8 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 1h 17min vs 1h 34min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~173 kWh vs ~186 kWh) means less time spent charging.
Related Comparisons