In our Dublin to Belgrade EV duel, the Renault 4 E-Tech 150 beats the Fiat 500e 42kWh by 123 minutes, completing the 2625km route in 32h 0min. The key advantage? 11 fewer charging stops. Route calculated on September 4, 2026 using real-time charging station data.
The Renault 4 E-Tech 150 needs only 17 charging stops compared to 28 for the slowest vehicle, saving valuable time.
Winner
Renault 4 E-Tech 150
- Total time: 32h 0min (123 min faster)
- Charging stops: 17
- Charging time: 3h 57min
- Energy: ~417 kWh
- Distance: 2625km
Quick Comparison
| Metric |
Fiat 500e 42kWh |
Renault 4 E-Tech 150 |
| Travel time |
34h 3min |
32h 0min |
| Charging time: |
5h 32min |
3h 57min |
| Charging stops: |
28 |
17 |
| Energy used |
~473 kWh |
~471 kWh |
Charging Strategy Breakdown
Fiat 500e 42kWh Route
- Start: Dublin (100% charge)
-
Stop 1:
Euro Garages (10 min, 33% → 53%)
-
Stop 2:
Eurogarages (18 min, 10% → 46%)
-
Stop 3:
IONITY Village Hotel (10 min, 10% → 43%)
-
Stop 4:
Watford Gap Services Southbound (10 min, 10% → 42%)
-
Stop 5:
Moto Toddington Southbound (11 min, 16% → 51%)
-
Stop 6:
IONITY DoubleTree by Hilton Dartford Bridge (10 min, 10% → 42%)
-
Stop 7:
IONITY Channel Gateway (10 min, 10% → 43%)
-
Stop 8:
Lidl Avenue Antoine de Saint-Exupéry (11 min, 10% → 45%)
-
Stop 9:
Fastned Oostendse Baan (10 min, 10% → 43%)
-
Stop 10:
Kalken direction Antwerpen (15 min, 10% → 54%)
-
Stop 11:
Lukoil (11 min, 10% → 45%)
-
Stop 12:
IONITY Aachener Land Süd (10 min, 10% → 44%)
-
Stop 13:
Shell Tankstelle (10 min, 10% → 42%)
-
Stop 14:
Supercharger Fashion Outlet Center (15 min, 11% → 55%)
-
Stop 15:
E.ON Weiskirchen Süd (10 min, 10% → 42%)
-
Stop 16:
Euro Hotel (13 min, 13% → 53%)
-
Stop 17:
Aral Autohof Gremsdorf (13 min, 10% → 50%)
-
Stop 18:
EWE Go McDonald's (11 min, 10% → 46%)
-
Stop 19:
IONITY Bayerischer Wald Süd (11 min, 10% → 47%)
-
Stop 20:
Shell Tankstelle (10 min, 10% → 42%)
-
Stop 21:
Raststation Voralpenkreuz (11 min, 10% → 47%)
-
Stop 22:
Raststation Trieben (10 min, 10% → 42%)
-
Stop 23:
OMV Tankstelle (10 min, 10% → 43%)
-
Stop 24:
IONITY Dobrenje Zahod (17 min, 10% → 60%)
-
Stop 25:
Kaufland (16 min, 10% → 58%)
-
Stop 26:
Odmorište Novska Jug (12 min, 10% → 48%)
-
Stop 27:
Tesla Supercharger (16 min, 10% → 58%)
-
Stop 28:
OMV Martinci (11 min, 10% → 47%)
- Arrival: Belgrade
Renault 4 E-Tech 150 Route
- Start: Dublin (100% charge)
-
Stop 1:
Supercharger Menai Science Park (11 min, 54% → 76%)
-
Stop 2:
Birmingham Armada (12 min, 10% → 48%)
-
Stop 3:
Supercharger Poplars Garden Centre (14 min, 10% → 53%)
-
Stop 4:
Maidstone services (11 min, 10% → 45%)
-
Stop 5:
Lidl Avenue Antoine de Saint-Exupéry (15 min, 10% → 56%)
-
Stop 6:
Fastned Gentbrugge Zuid (12 min, 10% → 49%)
-
Stop 7:
Total Zolder Zuid (15 min, 10% → 57%)
-
Stop 8:
Shell Tankstelle (13 min, 10% → 52%)
-
Stop 9:
Medenbach West (15 min, 10% → 57%)
-
Stop 10:
Aral Autohof Mainfrankenpark (11 min, 10% → 47%)
-
Stop 11:
Aral Tankstelle Nürnberger Straße 25 (12 min, 10% → 49%)
-
Stop 12:
IONITY Bayerischer Wald Süd (13 min, 10% → 51%)
-
Stop 13:
eCarUp Pendlerparkplatz (15 min, 10% → 57%)
-
Stop 14:
Raststation Kammern (11 min, 10% → 47%)
-
Stop 15:
IONITY Dobrenje Zahod (14 min, 10% → 53%)
-
Stop 16:
Supercharger Designer Outlet Croatia (20 min, 10% → 66%)
-
Stop 17:
Tesla Supercharger (23 min, 10% → 72%)
- Arrival: Belgrade
Why the Renault 4 E-Tech 150 Won
The Renault 4 E-Tech 150 achieved a 123-minute advantage over Fiat 500e 42kWh on this 2625km route. Key factors:
- Fewer charging stops: 17 stops vs 28 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 3h 57min vs 5h 32min thanks to higher peak charging speeds or better charging curve.
Related Comparisons