In our London to Vienna EV duel, the Aiways U5 beats the Citroën ë-Jumpy 50kWh by 82 minutes, completing the 1483km route in 16h 47min. The key advantage? 8 fewer charging stops. Route calculated on September 4, 2026 using real-time charging station data.
The Aiways U5 needs only 12 charging stops compared to 20 for the slowest vehicle, saving valuable time.
Winner
Aiways U5
- Total time: 16h 47min (82 min faster)
- Charging stops: 12
- Charging time: 2h 19min
- Energy: ~278 kWh
- Distance: 1483km
Quick Comparison
| Metric |
Aiways U5 |
Citroën ë-Jumpy 50kWh |
| Travel time |
16h 47min |
18h 9min |
| Charging time: |
2h 19min |
3h 27min |
| Charging stops: |
12 |
20 |
| Energy used |
~267 kWh |
~269 kWh |
Charging Strategy Breakdown
Aiways U5 Route
- Start: London (100% charge)
-
Stop 1:
Diksmuidestraat (10 min, 20% → 46%)
-
Stop 2:
Fastned Gentbrugge Zuid (10 min, 23% → 50%)
-
Stop 3:
Total Zolder Zuid (10 min, 10% → 37%)
-
Stop 4:
Aral Tankstelle Rue de Wattrelos (13 min, 13% → 49%)
-
Stop 5:
IONITY Oberhonnefeld (10 min, 10% → 39%)
-
Stop 6:
Medenbach West (13 min, 10% → 46%)
-
Stop 7:
Euro Hotel (11 min, 10% → 42%)
-
Stop 8:
Aral Autohof Gremsdorf (11 min, 10% → 41%)
-
Stop 9:
EWE Go McDonald's (10 min, 10% → 38%)
-
Stop 10:
IONITY Bayerischer Wald Süd (10 min, 10% → 38%)
-
Stop 11:
Shell Tankstelle (16 min, 10% → 52%)
-
Stop 12:
Electra Stop & Go Pendlerparkplatz Amstetten West (15 min, 10% → 51%)
- Arrival: Vienna
Citroën ë-Jumpy 50kWh Route
- Start: London (100% charge)
-
Stop 1:
IONITY Channel Gateway (10 min, 44% → 66%)
-
Stop 2:
Lidl Avenue Antoine de Saint-Exupéry (10 min, 24% → 56%)
-
Stop 3:
Fastned Oostendse Baan (10 min, 11% → 47%)
-
Stop 4:
Fastned Gentbrugge Zuid (10 min, 10% → 46%)
-
Stop 5:
Esso Express Krijgsbaan (10 min, 13% → 48%)
-
Stop 6:
Total Zolder Zuid (10 min, 11% → 47%)
-
Stop 7:
Shell Tienbaan (10 min, 16% → 51%)
-
Stop 8:
Aral Tankstelle Luxemburger Straße (10 min, 13% → 49%)
-
Stop 9:
IONITY Oberhonnefeld (10 min, 10% → 46%)
-
Stop 10:
IONITY Bad Camberg West (10 min, 10% → 48%)
-
Stop 11:
IONITY Weiskirchen Süd (10 min, 10% → 47%)
-
Stop 12:
Euro Hotel (14 min, 10% → 59%)
-
Stop 13:
Steigerwald Süd (10 min, 10% → 46%)
-
Stop 14:
Aral Tankstelle Nürnberger Straße 25 (10 min, 10% → 46%)
-
Stop 15:
Total Tankstelle (10 min, 14% → 49%)
-
Stop 16:
IONITY Bayerischer Wald Süd (10 min, 11% → 47%)
-
Stop 17:
IONITY Donautal West (10 min, 12% → 48%)
-
Stop 18:
Supercharger Pendlerparkplatz (10 min, 10% → 46%)
-
Stop 19:
JET Tankstelle (13 min, 13% → 58%)
-
Stop 20:
Raststation Sankt Pölten (10 min, 10% → 47%)
- Arrival: Vienna
Why the Aiways U5 Won
The Aiways U5 achieved a 82-minute advantage over Citroën ë-Jumpy 50kWh on this 1483km route. Key factors:
- Fewer charging stops: 12 stops vs 20 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 2h 19min vs 3h 27min thanks to higher peak charging speeds or better charging curve.
- Better efficiency: Lower energy consumption (~278 kWh vs ~369 kWh) means less time spent charging.
Related Comparisons