In our Lisbon to Dublin EV duel, the Renault 4 E-Tech 150 beats the Fiat 500e 42kWh by 157 minutes, completing the 2742km route in 33h 28min. The key advantage? 9 fewer charging stops. Route calculated on September 5, 2026 using real-time charging station data.
The Renault 4 E-Tech 150 needs only 19 charging stops compared to 28 for the slowest vehicle, saving valuable time.
Winner
Renault 4 E-Tech 150
- Total time: 33h 28min (157 min faster)
- Charging stops: 19
- Charging time: 4h 31min
- Energy: ~436 kWh
- Distance: 2742km
Quick Comparison
| Metric |
Fiat 500e 42kWh |
Renault 4 E-Tech 150 |
| Travel time |
36h 5min |
33h 28min |
| Charging time: |
6h 49min |
4h 31min |
| Charging stops: |
28 |
19 |
| Energy used |
~494 kWh |
~492 kWh |
Charging Strategy Breakdown
Fiat 500e 42kWh Route
- Start: Lisbon (100% charge)
-
Stop 1:
Área de serviço Vila Velha Ródão leste (18 min, 24% → 66%)
-
Stop 2:
Área de serviço da Guarda (10 min, 10% → 32%)
-
Stop 3:
Turismo (14 min, 16% → 57%)
-
Stop 4:
Avenida Juan Pablo II (15 min, 10% → 56%)
-
Stop 5:
Parking Calle Miravete (10 min, 10% → 42%)
-
Stop 6:
Area El Canto (10 min, 12% → 43%)
-
Stop 7:
Supercharger Hotel Landa (14 min, 17% → 57%)
-
Stop 8:
Bar Restaurante Lermanda (10 min, 10% → 43%)
-
Stop 9:
Supercharger Telleria Industrialdea (10 min, 11% → 43%)
-
Stop 10:
Lidl (10 min, 16% → 46%)
-
Stop 11:
Supercharger McDonald's (12 min, 14% → 51%)
-
Stop 12:
Aire de covoiturage de Mios-Marcheprime (14 min, 10% → 43%)
-
Stop 13:
Aire de Saugon Est (23 min, 10% → 67%)
-
Stop 14:
Aire du Poitou-Charentes Sud (25 min, 10% → 64%)
-
Stop 15:
Relais de la Ronde (16 min, 10% → 57%)
-
Stop 16:
Jardiland (43 min, 10% → 84%)
-
Stop 17:
Fastned Aire de Bosgouet Sud (10 min, 10% → 42%)
-
Stop 18:
Aire de Bosc-Mesnil (17 min, 16% → 62%)
-
Stop 19:
Aire des Falaises de Widehem Est (10 min, 10% → 32%)
-
Stop 20:
Supercharger Eurotunnel Flexiplus Lounge (10 min, 11% → 43%)
-
Stop 21:
IONITY Channel Gateway (10 min, 15% → 45%)
-
Stop 22:
IONITY DoubleTree by Hilton Dartford Bridge (13 min, 12% → 51%)
-
Stop 23:
Moto Toddington Northbound (10 min, 10% → 42%)
-
Stop 24:
Roadchef Watford Gap Northbound (10 min, 16% → 46%)
-
Stop 25:
IONITY Village Hotel (19 min, 13% → 63%)
-
Stop 26:
Supercharger Mountain Park Hotel (17 min, 10% → 59%)
-
Stop 27:
Port of Holyhead (19 min, 10% → 59%)
-
Stop 28:
Sir John Rogerson's Quay (10 min, 10% → 32%)
- Arrival: Dublin
Renault 4 E-Tech 150 Route
- Start: Lisbon (100% charge)
-
Stop 1:
IONITY Castelo Branco Leste (14 min, 30% → 66%)
-
Stop 2:
IONITY Cepsa (17 min, 10% → 61%)
-
Stop 3:
Parking Calle Miravete (19 min, 10% → 64%)
-
Stop 4:
IONITY Briviesca Sur (14 min, 10% → 54%)
-
Stop 5:
Supercharger Telleria Industrialdea (14 min, 10% → 53%)
-
Stop 6:
Supercharger McDonald's (19 min, 10% → 64%)
-
Stop 7:
Aire de Saugon Est (10 min, 10% → 41%)
-
Stop 8:
IONITY Aire de Saint-Léger Est (21 min, 25% → 76%)
-
Stop 9:
Relais de la Ronde (11 min, 10% → 45%)
-
Stop 10:
Jardiland (19 min, 10% → 65%)
-
Stop 11:
Fastned Aire de Bosgouet Sud (10 min, 10% → 41%)
-
Stop 12:
Les Viviers Canger (15 min, 19% → 61%)
-
Stop 13:
Supercharger Eurotunnel Flexiplus Lounge (11 min, 10% → 45%)
-
Stop 14:
IONITY Village Hotel (12 min, 10% → 50%)
-
Stop 15:
Moto Toddington Northbound (14 min, 10% → 53%)
-
Stop 16:
IONITY Village Hotel (12 min, 10% → 49%)
-
Stop 17:
Supercharger Mountain Park Hotel (11 min, 10% → 46%)
-
Stop 18:
Port of Holyhead (18 min, 10% → 46%)
-
Stop 19:
Sir John Rogerson's Quay (10 min, 10% → 26%)
- Arrival: Dublin
Why the Renault 4 E-Tech 150 Won
The Renault 4 E-Tech 150 achieved a 157-minute advantage over Fiat 500e 42kWh on this 2742km route. Key factors:
- Fewer charging stops: 19 stops vs 28 for the slowest vehicle means less time spent finding and connecting to chargers.
- Faster charging: Total charging time of 4h 31min vs 6h 49min thanks to higher peak charging speeds or better charging curve.
Related Comparisons